---
id: change/bcapps/10131
type: change
title: "#10131 [Extensibility Request] issue 30298: allow production scheduling direction control"
summary: Production order line quantity changes can now be extended to control scheduling direction, allowing backward or forward rescheduling instead of only backward scheduling.
tier: official
language: en
tags:
  - feature
  - main
  - bc30
  - table prod. order line
system: manufacturing
review:
  state: reviewed
  by: opus
  at: "2026-10-08T02:09:08.956Z"
  flags: []
generated:
  at: "2026-10-08T01:26:53.141Z"
  pipeline: 0.2.0
  prompts:
    extract-change: 1
  input_hash: 03a71173e9ec31fd9c983c922db19c8243f342d2
evidence:
  - kind: code
    url: https://github.com/microsoft/BCApps/pull/10131
    title: "microsoft/BCApps#10131: [Extensibility Request] issue 30298: allow production scheduling direction control"
    date: "2026-08-13"
    commit: 03a71173e9ec31fd9c983c922db19c8243f342d2
    t: null
    quote: Added handled events before validating Ending Time from Quantity and Quantity (Base), allowing extensions to override the hardcoded backward scheduling path in W1.
links:
  learn: []
  objects:
    - object/table/5406
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
  changes: []
number: 10131
repo: microsoft/BCApps
source_id: bcapps-prs
url: https://github.com/microsoft/BCApps/pull/10131
kind: pr
base_branch: main
major: "30"
merged_at: "2026-08-13T11:39:15Z"
author: AleksandricMarko
author_type: User
community_contribution: false
labels:
  - "Team: SCM"
  - event-request
change_class: code
change_kind: feature
behavior_change: false
breaking: false
files:
  count: 1
  additions: 20
  deletions: 3
  al: 1
apps:
  - Base Application
objects_touched:
  - key: table/5406
    page: table/5406
    type: table
    id: 5406
    name: Prod. Order Line
    app: Base Application
    status: modified
objects_unjoined: []
obsoletions: []
backports: []
fixes_issues: []
work_items:
  - 644773
systems:
  - manufacturing
quote: Added handled events before validating Ending Time from Quantity and Quantity (Base), allowing extensions to override the hardcoded backward scheduling path in W1.
joined_against:
  major: "30"
  commit: ecbc028c25dbe83b61313bc566e6c1d41184bb1c
---

# #10131 [Extensibility Request] issue 30298: allow production scheduling direction control

> Production order line quantity changes can now be extended to control scheduling direction, allowing backward or forward rescheduling instead of only backward scheduling.

[Pull request](https://github.com/microsoft/BCApps/pull/10131) · merged into `main` (BC30) on 2026-08-13 by AleksandricMarko · 1 file (+20 -3), 1 AL · feature · tier official · reviewed (checked by Opus)

## What changed

- Added handled events before quantity validations on Prod. Order Line
- Extensions can now override default backward scheduling behavior
- Allows start dates to remain unchanged when intended by users
- Applies to both Quantity and Quantity (Base) fields
- Extensibility enhancement for manufacturing scheduling control

## AL objects touched

- [Table 5406 "Prod. Order Line"](../../objects/table/5406.md), Base Application: modified

## Context

- Work items: AB#644773
- Labels: Team: SCM, event-request
- Systems: manufacturing
- From the description: "Added handled events before validating Ending Time from Quantity and Quantity (Base), allowing extensions to override the hardcoded backward scheduling path in W1."

Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).
