#10500 [Bug Fix] #190: Additional-Currency Total Cost incorrect on Project Ledger Entries
Project ledger entries now correctly record additional-currency total cost when a manual source currency exchange rate override is applied, matching G/L entry behavior.
- 6files
- 5AL files
- 2objects
Pull request · merged into main (BC30) on 2026-10-12 by ventselartur · 6 files (+139 -11), 5 AL · fix · tier official · reviewed (checked by Opus)
What changed
- Carry source currency code and source currency amount from Gen. Journal Line to Job Journal Line during transfer
- Skip currency re-conversion when source currency equals additional reporting currency, preserving overridden rates
- Ensures project and G/L ledger entries remain consistent for manually overridden exchange rates
- Added regression test demonstrating the fix
- Behaviour changes for users or extensions.
AL objects touched
- Codeunit 1004 “Job Transfer Line”, Base Application: modified
- Codeunit 1012 “Job Jnl.-Post Line”, Base Application: modified
src/Layers/BE/BaseApp/Projects/Project/Journal/JobTransferLine.Codeunit.al: modified, not in the BC30 snapshotsrc/Layers/NA/BaseApp/Projects/Project/Journal/JobTransferLine.Codeunit.al: modified, not in the BC30 snapshot
Context
- Work items: AB#643950
- Labels: Team: SCM
- Systems: projects
- From the description: “This fix makes the Job Ledger Entry honour the manually entered source-currency amount.”
Possibly related
No source states these links: they share an object, a model read them, or a person found the same subject.
- Resource - Cost Breakdown (report) — possibly related: Fixes currency calculations in project ledger entries and resource usage tracking. (model-linked)
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).