#11411 [Master]-Item Availability by BOM Level Produces Inconsistent Able-to-Make Results When G-TOP-BOM-02 Replenishment Changes from Assembly to Purchase - 2606050050002529
Fixed inconsistent able-to-make calculations in BOM analysis when a component's replenishment method changes between assembly and purchase types.
- 2files
- 1AL files
- 1objects
Pull request · merged into main (BC30) on 2026-09-15 by neeleshsinghal · 2 files (+131 -0), 1 AL · fix · tier official · reviewed (checked by Opus)
What changed
- Corrected BOM tree calculation logic for replenishment method transitions
- Added test coverage for mixed replenishment scenarios (assembly to purchase)
- Ensures item availability calculations remain consistent across component replenishment changes
- Behaviour changes for users or extensions.
AL objects touched
- Codeunit 5870 “Calculate BOM Tree”, Base Application: modified
Context
- Work items: AB#650094
- Labels: Team: SCM
- Systems: inventory
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).