---
id: change/bcapps/11644
type: change
title: "#11644 [Subcontracting] Bug 648937: Transfer WIP Item is lost when production orders are created from Planning Worksheet"
summary: The Transfer WIP Item setting and transfer descriptions from routing lines are now kept on Planning Routing Lines and carried through Planning Worksheet carry-out to production order routing lines. Previously they were lost when production orders were created from the Planning Worksheet.
tier: official
language: en
tags:
  - fix
  - main
  - bc30
  - codeunit subc. planning line mgmt ext.
  - tableextension subc. planning rtng. line
  - codeunit subc. prod. order rtng. ext.
system: manufacturing
review:
  state: reviewed
  by: opus
  at: "2026-10-08T02:03:39.052Z"
  flags: []
generated:
  at: "2026-10-08T01:26:53.141Z"
  pipeline: 0.2.0
  prompts:
    extract-change: 1
  input_hash: a84685a72ab18bb9397694caa0c1323711e6d93e
evidence:
  - kind: code
    url: https://github.com/microsoft/BCApps/pull/11644
    title: "microsoft/BCApps#11644: [Subcontracting] Bug 648937: Transfer WIP Item is lost when production orders are created from Planning Worksheet"
    date: "2026-09-28"
    commit: a84685a72ab18bb9397694caa0c1323711e6d93e
    t: null
    quote: preserve Transfer WIP Item and transfer descriptions on Planning Routing Line
links:
  learn: []
  objects:
    - object/codeunit/20518
    - object/tableextension/20530
    - object/codeunit/20520
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
  changes: []
number: 11644
repo: microsoft/BCApps
source_id: bcapps-prs
url: https://github.com/microsoft/BCApps/pull/11644
kind: pr
base_branch: main
major: "30"
merged_at: "2026-09-28T10:24:58Z"
author: ChethanT
author_type: User
community_contribution: false
labels:
  - "AL: Apps (W1)"
  - Subcontracting
  - "Team: SCM"
change_class: code
change_kind: fix
behavior_change: true
breaking: false
files:
  count: 4
  additions: 263
  deletions: 9
  al: 3
apps:
  - Subcontracting
objects_touched:
  - key: codeunit/20518
    page: codeunit/20518
    type: codeunit
    id: 20518
    name: Subc. Planning Line Mgmt Ext.
    app: Subcontracting
    status: modified
  - key: tableextension/20530
    page: tableextension/20530
    type: tableextension
    id: 20530
    name: Subc. Planning Rtng. Line
    app: Subcontracting
    status: added
  - key: codeunit/20520
    page: codeunit/20520
    type: codeunit
    id: 20520
    name: Subc. Prod. Order Rtng. Ext.
    app: Subcontracting
    status: modified
objects_unjoined: []
obsoletions: []
backports:
  - number: 11962
    base: releases/29.x
    url: https://github.com/microsoft/BCApps/pull/11962
fixes_issues: []
work_items:
  - 648937
systems:
  - manufacturing
quote: preserve Transfer WIP Item and transfer descriptions on Planning Routing Line
joined_against:
  major: "30"
  commit: ecbc028c25dbe83b61313bc566e6c1d41184bb1c
---

# #11644 [Subcontracting] Bug 648937: Transfer WIP Item is lost when production orders are created from Planning Worksheet

> The Transfer WIP Item setting and transfer descriptions from routing lines are now kept on Planning Routing Lines and carried through Planning Worksheet carry-out to production order routing lines. Previously they were lost when production orders were created from the Planning Worksheet.

[Pull request](https://github.com/microsoft/BCApps/pull/11644) · merged into `main` (BC30) on 2026-09-28 by ChethanT · 4 files (+263 -9), 3 AL · fix · tier official · reviewed (checked by Opus)

## What changed

- Transfer WIP Item and transfer descriptions are now stored on planning routing lines
- Values are propagated from routing lines through Planning Worksheet carry-out to production order routing lines
- Support includes both certified routing versions and base routings
- Integration tests added to verify the behavior
- Fixes data loss issue when creating production orders from planning worksheet
- Behaviour changes for users or extensions.

## AL objects touched

- [Codeunit 20518 "Subc. Planning Line Mgmt Ext."](../../objects/codeunit/20518.md), Subcontracting: modified
- [Table extension 20530 "Subc. Planning Rtng. Line"](../../objects/tableextension/20530.md), Subcontracting: added
- [Codeunit 20520 "Subc. Prod. Order Rtng. Ext."](../../objects/codeunit/20520.md), Subcontracting: modified

## Also merged into

- [#11962](https://github.com/microsoft/BCApps/pull/11962) into `releases/29.x` on 2026-10-02

## Context

- Work items: AB#648937
- Labels: AL: Apps (W1), Subcontracting, Team: SCM
- Systems: manufacturing
- From the description: "preserve Transfer WIP Item and transfer descriptions on Planning Routing Line"

Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).
