#11945 Bug 648959: [Subcontracting] Fix serial splitting for non-last subcontracting put-away lines
Subcontracting inventory put-away lines with serial tracking are no longer incorrectly split into quantity-1 lines when not marked as last operation.
- 2files
- 1AL files
- 1objects
Pull request · merged into main (BC30) on 2026-09-30 by ChethanT · 2 files (+100 -0), 1 AL · fix · tier official · reviewed (checked by Opus)
What changed
- Serial tracking fallback logic is intercepted for non-physical NotLastOperation lines
- Full remaining quantity is inserted through the standard inventory put-away path for NotLastOperation
- Regression test added to verify line cardinality, zero base quantities, blank tracking, and absence of physical ledger entries
- Behaviour changes for users or extensions.
AL objects touched
- Codeunit 20575 “Subc. Invt. Put-away Ext”, Subcontracting: modified
Also merged into
- #12126 into
releases/29.xon 2026-10-02
Context
- Work items: AB#648959
- Labels: AL: Apps (W1), Team: SCM
- Systems: manufacturing
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).