#12201 [29.X]- Incorrect project ledger costs when non-deductible VAT is posted to a foreign-currency project
Fixed incorrect project ledger costs when non-deductible VAT is posted to foreign-currency projects by correctly mapping currency amounts in the VAT-to-job conversion process.
- 3files
- 1AL files
- 1objects
Pull request · merged into releases/29.x (BC29) on 2026-10-22 by neeleshsinghal · 3 files (+39 -20), 1 AL · fix · tier official · reviewed (checked by Opus)
What changed
- CopyNonDedVATFromGenJnlLineToJobJnlLine had swapped currency paths: a project-currency amount went into LCY cost and an LCY amount into project cost
- LCY unit and total costs now use the non-deductible VAT LCY amount
- Project-currency unit and total costs now use the source VAT amount converted into the project currency
- Tests updated in W1 and IT layers
- Behaviour changes for users or extensions.
AL objects touched
- Codeunit 6201 “Non-Ded. VAT Impl.”, Base Application: modified
Context
- Work items: AB#652547
- Labels: Team: Finance
- Systems: finance
- From the description: “The current code adds a project-currency amount to LCY cost and an LCY amount to project cost.”
Possibly related
No source states these links: they share an object, a model read them, or a person found the same subject.
- Design details - Non-deductible VAT — possibly related: Documents non-deductible VAT design details including foreign currency project posting (model-linked)
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).