#12464 [Master]-Order Planning Calculate Plan Stops on Blocked Item and Does Not Process Remaining Valid Demand.
Order Planning feature now correctly processes remaining valid demand items when a blocked item is encountered instead of stopping the entire calculation.
- 4files
- 3AL files
- 2objects
Pull request · merged into main (BC30) on 2026-10-14 by neeleshsinghal · 4 files (+354 -6), 3 AL · fix · tier official · reviewed (checked by Opus)
What changed
- Order planning calculation no longer stops when it reaches a blocked item
- Remaining valid demand is still processed after a blocked item
- Changes Order Planning Mgt. and the Requisition Line table in the W1 and IT layers
- Adds tests in SCM Order Planning II for the scenario
- Behaviour changes for users or extensions.
AL objects touched
- Codeunit 5522 “Order Planning Mgt.”, Base Application: modified
- Table 246 “Requisition Line”, Base Application: modified
src/Layers/IT/BaseApp/Inventory/Requisition/RequisitionLine.Table.al: modified, not in the BC30 snapshot
Context
- Work items: AB#651525
- Labels: Team: SCM
- Systems: inventory
Possibly related
No source states these links: they share an object, a model read them, or a person found the same subject.
- Purchase and Sales Quantity Power BI Report — possibly related: touches Table 246 “Requisition Line”
- Scheduled Receipt Power BI Report — possibly related: touches Table 246 “Requisition Line”
- Plan for New Demand Order by Order — possibly related: Documents Order Planning page functionality and manual demand planning, directly related to Order Planning Calculate Plan fix. (model-linked)
- Run Full Planning, MPS, or MRP — possibly related: Documents full planning and MRP processes, relevant to requisition line planning behavior. (model-linked)
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).