#13293 [29.X]-WIP transfer warehouse shipment incorrectly requires Bin Code
On BC29, posting a warehouse shipment for a WIP transfer in Subcontracting no longer incorrectly requires a Bin Code. The fix touches the Subcontracting shipment extension and the base Whse.-Post Shipment codeunit, and adds tests.
- 3files
- 2AL files
- 2objects
Pull request · merged into releases/29.x (BC29) on 2026-10-29 by neeleshsinghal · 3 files (+109 -2), 2 AL · fix · tier official · reviewed (checked by Opus)
What changed
- Fixes an incorrect Bin Code requirement when posting WIP transfer warehouse shipments
- Changes the Subc. WhsePostShipment Ext codeunit and codeunit 5763 Whse.-Post Shipment
- Adds tests for WIP transfer posting
- Same fix on the releases/29.x branch
- Behaviour changes for users or extensions.
AL objects touched
- Codeunit 20563 “Subc. WhsePostShipment Ext”, Subcontracting: modified
- Codeunit 5763 “Whse.-Post Shipment”, Base Application: modified
Context
- Work items: AB#648952
- Labels: AL: Apps (W1), Team: SCM
- Systems: manufacturing, warehouse
Possibly related
No source states these links: they share an object, a model read them, or a person found the same subject.
- Design Details - Integration with Inventory — possibly related: Explains warehouse adjustments and bin tracking integration with inventory during physical inventory processes. (model-linked)
- Transfer WIP items between subcontractors — possibly related: Covers WIP transfer between subcontractors tracking quantities in ledger entries during manufacturing. (model-linked)
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).