#13427 [Quality Management] Confirm before finishing on Create Re-inspection
Quality inspections now ask for confirmation before finishing when creating a re-inspection on an open inspection, preventing unintended state changes if the user declines.
- 2files
- 1AL files
- 1objects
Pull request · merged into main (BC30) on 2026-11-05 by alexei-dobriansky · 2 files (+98 -8), 1 AL · fix · tier official · reviewed (checked by Opus)
What changed
- Confirmation dialog moved before any changes occur for open inspections
- Answering No leaves the inspection open with no automatic finish
- Already finished inspections preserve existing confirmation behavior
- Non-interactive callers like APIs remain unaffected
- New tests validate both accepted and declined scenarios
- Behaviour changes for users or extensions.
AL objects touched
- Table 20405 “Qlty. Inspection Header”, Quality Management: modified
Also merged into
- #13796 into
releases/29.xon 2026-11-10
Context
- Work items: AB#655843
- Labels: AL: Apps (W1), Team: SCM
- Systems: inventory
- From the description: “The confirmation is now asked before anything changes”
Possibly related
No source states these links: they share an object, a model read them, or a person found the same subject.
- Create an inspection automatically from a warehouse receipt and reinspect the lot — possibly related: Documents creating reinspections after initial quality inspection failures in warehouse operations. (model-linked)
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).