#13442 [SCM] Post Inventory Cost to G/L: stop using marks, add clean-up for Post Value Entry to G/L
Report 1002 now stops using marks to delete processed rows and instead filters by value entry numbers, adds automatic cleanup of stale rows, and introduces a new page and report for managing value entries to post to G/L.
- 6files
- 5AL files
- 3objects
Pull request · merged into main (BC30) on 2026-11-06 by alexei-dobriansky · 6 files (+1114 -19), 5 AL · fix · tier official · reviewed (checked by Opus)
What changed
- Report 1002 collects processed entries in a temporary table and deletes by filtered ranges instead of using marks, fixing platform issues with row-by-row deletes on large datasets
- Stale rows (fully posted or orphaned entries) are now automatically removed from table 5811 when posting, preventing accumulation that can block future runs
- New page 5813 shows value entries to post to G/L with amounts, accessible from the Inventory Cost Adjustment overview
- New report 5813 allows customers to manually clean up stale rows with a count-only option
- Page 5801 Inventory Cost Adjustment replaces show/hide actions with views and hides obsolete actions
- Behaviour changes for users or extensions.
AL objects touched
- Page 5801 “Cost Adjustment Overview”, Base Application: modified
- Report 1002 “Post Inventory Cost to G/L”, Base Application: modified
- Table 5811 “Post Value Entry to G/L”, Base Application: modified
src/Layers/W1/BaseApp/Inventory/Costing/CleanUpPostValueEntries.Report.al: added, not in the BC30 snapshot yetsrc/Layers/W1/BaseApp/Inventory/Costing/PostValueEntriestoGL.Page.al: added, not in the BC30 snapshot yet
Also merged into
- #13795 into
releases/29.xon 2026-11-13
Context
- Work items: AB#657019
- Labels: Team: SCM
- Systems: inventory
Possibly related
No source states these links: they share an object, a model read them, or a person found the same subject.
- Record Consumption or Usage of Project Resources and Items — possibly related: touches Report 1002 “Post Inventory Cost to G/L”
- Design details - Cost adjustment — possibly related: Design details on cost adjustment mechanism and value entry to G/L processing. (model-linked)
- Reconcile inventory costs with the general ledger — possibly related: Documents Post Inventory Cost to G/L batch job and reconciliation process, central to this change. (model-linked)
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).