#9123 Bug 641489: Show Next/Previous Operation No. on routing lines when Type = Parallel
Next Operation No. and Previous Operation No. fields on routing lines now automatically show when routing type is Parallel instead of remaining hardcoded invisible, eliminating the need for manual personalization.
- 6files
- 6AL files
- 4objects
Pull request · merged into main (BC30) on 2026-07-10 by alexei-dobriansky · 6 files (+76 -8), 6 AL · fix · tier official · reviewed (checked by Opus)
What changed
- Next and Previous Operation No. are no longer hardcoded hidden on the Routing Lines and Routing Version Lines subforms
- Fields show when routing Type is Parallel and hide when it is Serial
- New public SetParallelFieldsVisible setter on the subforms controls visibility
- Routing and Routing Version cards call the setter from OnAfterGetRecord and the Type field OnValidate
- Change also applied to the IT layer routing subforms
- Behaviour changes for users or extensions.
AL objects touched
- Page 99000765 “Routing Lines”, Base Application: modified
- Page 99000766 “Routing”, Base Application: modified
- Page 99000810 “Routing Version”, Base Application: modified
- Page 99000767 “Routing Version Lines”, Base Application: modified
src/Layers/IT/BaseApp/Manufacturing/Routing/RoutingVersionLines.Page.al: modified, not in the BC30 snapshot
Context
- Work items: AB#641489
- Labels: Team: SCM
- Systems: manufacturing
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).