---
id: change/bcapps/9214
type: change
title: "#9214 WorkCenter/MachineCenter: add Capacity Shown In to Calendar and Load pages"
summary: Work Center and Machine Center Calendar and Load pages now include a Capacity Shown In field to display capacity figures in different units of measure (seconds, minutes, hours, or days), matching the functionality already available on Work Center Group pages.
tier: official
language: en
tags:
  - feature
  - main
  - bc30
  - page machine center calendar
  - page machine center calendar matrix
  - page machine center load
  - page machine center load lines
  - page work center calendar
  - page work center calendar matrix
system: manufacturing
review:
  state: reviewed
  by: opus
  at: "2026-11-08T00:59:03.780Z"
  flags: []
generated:
  at: "2026-11-18T00:16:36.082Z"
  pipeline: 0.2.0
  prompts:
    extract-change: 1
  input_hash: 38206b69b80cd52d2b669e278371ef373686bb71
evidence:
  - kind: code
    url: https://github.com/microsoft/BCApps/pull/9214
    title: "microsoft/BCApps#9214: WorkCenter/MachineCenter: add Capacity Shown In to Calendar and Load pages"
    date: "2026-11-06"
    commit: 38206b69b80cd52d2b669e278371ef373686bb71
    t: null
    quote: Work Center and Machine Center Calendar and Load pages were missing the Capacity Shown In field that the Work Center Group pages already have.
links:
  learn: []
  objects:
    - object/page/99000770
    - object/page/9293
    - object/page/99000889
    - object/page/99000890
    - object/page/99000769
    - object/page/9291
    - object/page/99000887
    - object/page/99000888
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
  changes: []
  related:
    - to: https://learn.microsoft.com/dynamics365/business-central/production-how-to-set-up-work-and-machine-centers
      title: Set up work centers and machine centers
      label: possibly related
      why: touches Page 99000887 "Work Center Load"
      by: code
    - to: https://learn.microsoft.com/dynamics365/business-central/production-how-to-view-the-load-on-work-centers
      title: View Load on Work and Machine Centers
      label: possibly related
      why: touches Page 99000889 "Machine Center Load"
      by: code
number: 9214
repo: microsoft/BCApps
source_id: bcapps-prs
url: https://github.com/microsoft/BCApps/pull/9214
kind: pr
base_branch: main
major: "30"
merged_at: "2026-11-06T10:18:05Z"
author: Busslar
author_type: User
community_contribution: true
labels:
  - "ADO: Sync"
  - From Fork
  - "Team: SCM"
change_class: code
change_kind: feature
behavior_change: true
breaking: false
files:
  count: 10
  additions: 445
  deletions: 20
  al: 8
apps:
  - Base Application
objects_touched:
  - key: page/99000770
    page: page/99000770
    type: page
    id: 99000770
    name: Machine Center Calendar
    app: Base Application
    status: modified
  - key: page/9293
    page: page/9293
    type: page
    id: 9293
    name: Machine Center Calendar Matrix
    app: Base Application
    status: modified
  - key: page/99000889
    page: page/99000889
    type: page
    id: 99000889
    name: Machine Center Load
    app: Base Application
    status: modified
  - key: page/99000890
    page: page/99000890
    type: page
    id: 99000890
    name: Machine Center Load Lines
    app: Base Application
    status: modified
  - key: page/99000769
    page: page/99000769
    type: page
    id: 99000769
    name: Work Center Calendar
    app: Base Application
    status: modified
  - key: page/9291
    page: page/9291
    type: page
    id: 9291
    name: Work Center Calendar Matrix
    app: Base Application
    status: modified
  - key: page/99000887
    page: page/99000887
    type: page
    id: 99000887
    name: Work Center Load
    app: Base Application
    status: modified
  - key: page/99000888
    page: page/99000888
    type: page
    id: 99000888
    name: Work Center Load Lines
    app: Base Application
    status: modified
objects_unjoined: []
obsoletions: []
backports: []
fixes_issues:
  - 9205
work_items:
  - 646407
systems:
  - manufacturing
quote: Work Center and Machine Center Calendar and Load pages were missing the Capacity Shown In field that the Work Center Group pages already have.
joined_against:
  major: "30"
  commit: d2abc1d2ceae394331716c8183ef60e1534c2ce0
---

# #9214 WorkCenter/MachineCenter: add Capacity Shown In to Calendar and Load pages

> Work Center and Machine Center Calendar and Load pages now include a Capacity Shown In field to display capacity figures in different units of measure (seconds, minutes, hours, or days), matching the functionality already available on Work Center Group pages.

[Pull request](https://github.com/microsoft/BCApps/pull/9214) · merged into `main` (BC30) on 2026-11-06 by Busslar (community contribution) · 10 files (+445 -20), 8 AL · feature · tier official · reviewed (checked by Opus)

## What changed

- Added Capacity Shown In field to the Work Center and Machine Center Calendar and Load pages
- Field initializes from Manufacturing Setup Show Capacity In and lets users switch capacity units
- Calendar matrix Load() gains a capacity unit parameter and converts Capacity (Effective) with TimeFactor
- Load lines SetLines() gains a unit parameter; Capacity, Allocated Qty. and Availability After Orders are converted, Load % unchanged
- Implementation mirrors the existing Work Center Group pages
- Behaviour changes for users or extensions.

## AL objects touched

- [Page 99000770 "Machine Center Calendar"](../../objects/page/99000770.md), Base Application: modified
- [Page 9293 "Machine Center Calendar Matrix"](../../objects/page/9293.md), Base Application: modified
- [Page 99000889 "Machine Center Load"](../../objects/page/99000889.md), Base Application: modified
- [Page 99000890 "Machine Center Load Lines"](../../objects/page/99000890.md), Base Application: modified
- [Page 99000769 "Work Center Calendar"](../../objects/page/99000769.md), Base Application: modified
- [Page 9291 "Work Center Calendar Matrix"](../../objects/page/9291.md), Base Application: modified
- [Page 99000887 "Work Center Load"](../../objects/page/99000887.md), Base Application: modified
- [Page 99000888 "Work Center Load Lines"](../../objects/page/99000888.md), Base Application: modified

## Context

- Fixes: [#9205 [BC Idea]: "Capacity shown in" on Work Center and Machine Center Calendar and Load](https://github.com/microsoft/BCApps/issues/9205) (closed)
- Work items: AB#646407
- Labels: ADO: Sync, From Fork, Team: SCM
- Systems: manufacturing
- From the description: "Work Center and Machine Center Calendar and Load pages were missing the Capacity Shown In field that the Work Center Group pages already have."

## Possibly related

No source states these links: they share an object, a model read them, or a person found the same subject.

- [Set up work centers and machine centers](https://learn.microsoft.com/dynamics365/business-central/production-how-to-set-up-work-and-machine-centers) — possibly related: touches Page 99000887 "Work Center Load"
- [View Load on Work and Machine Centers](https://learn.microsoft.com/dynamics365/business-central/production-how-to-view-the-load-on-work-centers) — possibly related: touches Page 99000889 "Machine Center Load"

Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).
