code change · featureManufacturingofficial - Microsoftreviewed - checked by Opus

#9276 Add second subcontractor (Local Assembly) to Contoso Coffee manufacturing demo data

Contoso Coffee manufacturing demo data now includes a second subcontractor (Local Assembly) alongside the renamed Bulk Assembly subcontractor, with corresponding work centers, locations, and routing updates to support dual-sourcing scenarios.

Pull request · merged into main (BC30) on 2026-08-13 by attilatoury · 4 files (+46 -8), 4 AL · feature · tier official · reviewed (checked by Opus)

What changed

  • Existing subcontractor renamed to Bulk Assembly (vendor 82000, work center 500, location code changed from 82000 to S82000)
  • New second subcontractor Local Assembly added (vendor 83000, work center 600 with capacity 40, location S83000)
  • Inventory posting setup rows added for S82000 and S83000, created after the locations exist
  • Routing SP-SCM1009-SUB-2 now uses work center 600 (concurrent capacity 100 to 40); SUB-1 stays on work center 500
  • Forward-only demo data: databases already seeded with the old records are not migrated or overwritten
  • Behaviour changes for users or extensions.

AL objects touched

Context

  • Work items: AB#639660
  • Labels: AL: Apps (W1), Team: SCM
  • Systems: manufacturing
  • From the description: “Modern SCM demos need dual-sourcing across multiple subcontractors.”

Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).