---
id: feature/573358
type: feature
title: Work more efficiently with manufacturing documents and capacity calendars
summary: "Supply Chain Management: Work more efficiently with manufacturing documents and capacity calendars. Generally available, GA 2026-10 (Microsoft 365 roadmap). Business Value Planners and production managers often move between planning worksheets, production orders, work and machine centers, production BOMs, and routings to complete routine work. Small gaps in page actions, fields, filtering, and error navigation add unnecessary steps and can delay production scheduling. Details These improvements place manufacturing information and actions closer to the records where you work."
tier: official
language: en
system: inventory
tags:
  - supply chain management
review:
  state: derived
  by: null
  at: null
  flags: []
generated:
  at: "2026-10-07T23:41:05.192Z"
  pipeline: 0.2.0
  prompts: {}
  input_hash: 582c44125aed16efa8f6af06de0a71abd3cfc04ae02eb6cdb04fb367518d55cb
evidence:
  - kind: roadmap
    url: https://www.microsoft.com/microsoft-365/roadmap?id=573358
    title: Microsoft 365 roadmap 573358
    date: "2026-09-30"
    commit: null
    t: null
    quote: null
  - kind: video
    url: https://www.youtube.com/watch?v=WACQbAEVOJg&t=456s
    title: "What's new in SCM: Overview (2026 release wave 2): Machine center calendar entries availability check"
    date: null
    commit: null
    t: 456
    quote: null
links:
  learn: []
  objects: []
  features: []
  topics: []
  localizations: []
  videos:
    - video/WACQbAEVOJg
  posts: []
  guidelines: []
roadmap_id: "573358"
wave: 2026 release wave 2
status: ga
roadmap_status: Launched
release_phase: General Availability
ga_date: 2026-10
preview_date: null
area: Supply Chain Management
whatsnew_url: null
localizations: []
objects_touched: []
---

# Work more efficiently with manufacturing documents and capacity calendars

> Supply Chain Management: Work more efficiently with manufacturing documents and capacity calendars. Generally available, GA 2026-10 (Microsoft 365 roadmap). Business Value Planners and production managers often move between planning worksheets, production orders, work and machine centers, production BOMs, and routings to complete routine work. Small gaps in page actions, fields, filtering, and error navigation add unnecessary steps and can delay production scheduling. Details These improvements place manufacturing information and actions closer to the records where you work.

[Microsoft 365 roadmap 573358](https://www.microsoft.com/microsoft-365/roadmap?id=573358) · Supply Chain Management · generally available · roadmap status "Launched", phase General Availability

## What Microsoft says

Business Value Planners and production managers often move between planning worksheets, production orders, work and machine centers, production BOMs, and routings to complete routine work. Small gaps in page actions, fields, filtering, and error navigation add unnecessary steps and can delay production scheduling. Details These improvements place manufacturing information and actions closer to the records where you work. You can create released production orders directly from planning suggestions, monitor and calculate capacity calendars, correct uncertified production definitions from actionable errors, and find relevant manufacturing details with less navigation. Create released production orders from planning suggestions On the Planning Worksheet , run Carry Out Action Message and choose one of the new production order options: Released creates released production orders directly from the accepted planning lines. Released & Print creates released production orders and includes them in production order printing. Calculate and monitor capacity calendars You can run Calculate Work Center Calendar from the Work Center Card and Calculate Machine Center Calendar from the Machine Center Card . The reports open for the current center, so you don't need to return to the list page. The Calendar Entries Available Until field on Work Center and Machine Center cards and lists shows the latest date for which calendar entries exist. A date earlier than the work date appears in the warning style so that you can identify calendars that need recalculation before scheduling fails. Resolve uncertified BOM and routing errors When a production order references a production BOM or routing that isn't certified, the validation error provides a navigation action: Show Production BOM [number] opens the affected Production BOM. Show Routing [number] opens the affected Routing. Certify the document and retry the operation. Find and maintain manufacturing information more easily The following page improvements reduce extra navigation and prevent avoidable errors: Copy Production Order Document excludes the current production order from the Document No. lookup when the source and destination statuses match. Routing Link Code is available on Planning Routing , Prod. Order Components , and Prod. Order Comp. Line List .

## Dates

- General availability: October CY2026 (2026 release wave 2)
- Public preview: not given
- On the roadmap since 2026-09-30, last changed 2026-09-30

## Covered by

Matched by Haiku among videos and Learn pages in the same galaxy system, checked against the roadmap ids and the evidence text. Every link below was reviewed by Opus.

### Videos

- [What's new in SCM: Overview (2026 release wave 2)](../videos/WACQbAEVOJg.md): Machine center calendar entries availability check at [7:36](https://www.youtube.com/watch?v=WACQbAEVOJg&t=456s)

Source: Microsoft 365 roadmap. Status words follow the roadmap.
