---
id: object/codeunit/6325
type: object
title: Codeunit 6325 "Power BI Report Synchronizer"
summary: Codeunit 6325 "Power BI Report Synchronizer" in Base Application (System.Integration.PowerBI). 2 public procedures. Present since at least BC23, still in BC30, changed in BC25-26, BC28-29.
tier: official
language: en
tags:
  - codeunit
  - base application
versions:
  introduced: null
  last_changed: "29"
  deprecated: null
review:
  state: derived
  by: null
  at: null
  flags: []
generated:
  at: "2026-10-11T00:31:51.816Z"
  pipeline: 0.2.0
  prompts: {}
  input_hash: 223d6cc2ed441feaf9ec8d23d796d0b4ee5bbcf927d5cded4386bffb7554d5a7
evidence:
  - kind: code
    url: https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Modules/System/PowerBI/APIs/PowerBIReportSynchronizer.Codeunit.al
    title: src/Layers/W1/BaseApp/Modules/System/PowerBI/APIs/PowerBIReportSynchronizer.Codeunit.al (releases/29.x)
    date: null
    commit: ea08af5ef2d6a9b5c5af4a029288abbe2c883220
    t: null
    quote: null
links:
  learn: []
  objects: []
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
  changes:
    - change/bcapps/12242
    - change/bcapps/10348
object_type: codeunit
object_id: 6325
name: Power BI Report Synchronizer
namespace: System.Integration.PowerBI
app: Base Application
extends: null
first_version: "23"
last_version: "30"
present_in:
  - "23"
  - "24"
  - "25"
  - "26"
  - "27"
  - "28"
  - "29"
  - "30"
changed_in:
  - "25"
  - "26"
  - "28"
  - "29"
source_major: "29"
obsolete: null
countries: []
ms_search_form_ids: []
counts:
  fields: 0
  procedures: 5
  events: 0
  subscribers: 0
relations:
  out: 1
  referenced_by: 0
  pages: 0
  extended_by: 0
  event_subscribers: 0
  calls: 5
  called_by: 3
  implements: 0
---

# Codeunit 6325 "Power BI Report Synchronizer"

> Codeunit 6325 "Power BI Report Synchronizer" in Base Application (System.Integration.PowerBI). 2 public procedures. Present since at least BC23, still in BC30, changed in BC25-26, BC28-29.

Base Application · System.Integration.PowerBI · BC23-30 · [source at ea08af5e](https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Modules/System/PowerBI/APIs/PowerBIReportSynchronizer.Codeunit.al) · facts from BC29

## Properties

| Property | Value |
|---|---|
| TableNo | Job Queue Entry |

## Procedures

- `UserNeedsToSynchronize(Context: Text[50]): Boolean`
- `CanSynchronizeReports(): Boolean` (internal)

Plus 3 local procedures.

## Triggers

OnRun

## Relations

- runs on [Table 472 "Job Queue Entry"](../table/472.md)

## Calls

From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an `Object::"Name"` argument. Interface dispatch and calls through events are not counted, so the list is not complete.

- [Codeunit 6327 "Power BI Report Aggregator"](../codeunit/6327.md) (4 calls: `OnRun → LoadAllPending`, `OnRun → Next`, `OnRun → PendingCount`, …)
- [Codeunit 6334 "Power BI Upload Step Runner"](../codeunit/6334.md) (2 calls: `OnRun → (object)`, `OnRun → Configure`)
- [Codeunit 457 "Environment Information"](../codeunit/457.md) (1 call: `CanSynchronizeReports → IsSaaSInfrastructure`)
- [Codeunit 6301 "Power BI Service Mgt."](../codeunit/6301.md) (1 call: `OnRun → GetPowerBiTelemetryCategory`)
- [Codeunit 6319 "Power BI Workspace Mgt."](../codeunit/6319.md) (1 call: `TargetWorkspaceIsValid → WorkspaceExists`)

## Called by

- [Page 6325 "Power BI Embedded Report Part"](../page/6325.md) (2 calls: `OnInit → CanSynchronizeReports`, `ReloadPageState → UserNeedsToSynchronize`)
- [Page 6327 "Power BI Embed Setup Wizard"](../page/6327.md) (2 calls: `ShowDeploymentStep → UserNeedsToSynchronize`, `StartAutoDeployment → UserNeedsToSynchronize`)
- [Page 6320 "Upload Power BI Report"](../page/6320.md) (1 call: `OnClosePage → UserNeedsToSynchronize`)

## Recent changes

- 2026-10-05 [#12242 29.x: Removing the restriction of deploying Power BI reports only to evaluation companies](../../changes/bcapps/12242.md) (releases/29.x, BC29, feature)
- 2026-09-10 [#10348 Adding a Power BI workspace to Company Information to be used when deploying reports](../../changes/bcapps/10348.md) (main, BC30, feature)

## Across versions

- Present in: BC23-30
- Changed (declaration) in: BC25-26, BC28-29

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

## Ask your agent

Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: `bcatlas_resolve_node(object_type: "codeunit", object_name: "Power BI Report Synchronizer")`, then `bcatlas_get_procedure_body` or `bcatlas_get_neighbors` on the returned id.
