---
id: object/page/1028
type: object
title: Page 1028 "Job WIP Totals"
summary: Page 1028 "Job WIP Totals" in Base Application (Microsoft.Projects.Project.WIP). Present since at least BC23, still in BC30, changed in BC24.
tier: official
language: en
tags:
  - page
  - base application
versions:
  introduced: null
  last_changed: "24"
  deprecated: null
review:
  state: derived
  by: null
  at: null
  flags: []
generated:
  at: "2026-10-11T00:31:51.816Z"
  pipeline: 0.2.0
  prompts: {}
  input_hash: ad796e615a4214bd4da9df7c069f0f42d7686fe9a1ae0fd41b0937e1766ebdbc
evidence:
  - kind: code
    url: https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Projects/Project/WIP/JobWIPTotals.Page.al
    title: src/Layers/W1/BaseApp/Projects/Project/WIP/JobWIPTotals.Page.al (releases/29.x)
    date: null
    commit: ea08af5ef2d6a9b5c5af4a029288abbe2c883220
    t: null
    quote: null
links:
  learn: []
  objects: []
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
object_type: page
object_id: 1028
name: Job WIP Totals
caption: Project WIP Totals
namespace: Microsoft.Projects.Project.WIP
app: Base Application
extends: null
first_version: "23"
last_version: "30"
present_in:
  - "23"
  - "24"
  - "25"
  - "26"
  - "27"
  - "28"
  - "29"
  - "30"
changed_in:
  - "24"
source_major: "29"
obsolete: null
countries: []
ms_search_form_ids: []
counts:
  fields: 0
  procedures: 0
  events: 0
  subscribers: 0
  controls: 16
  actions: 0
relations:
  out: 1
  referenced_by: 0
  pages: 2
  extended_by: 0
  event_subscribers: 0
  calls: 0
  called_by: 0
  implements: 0
---

# Page 1028 "Job WIP Totals"

> Page 1028 "Job WIP Totals" in Base Application (Microsoft.Projects.Project.WIP). Present since at least BC23, still in BC30, changed in BC24.

Base Application · Microsoft.Projects.Project.WIP · captioned "Project WIP Totals" · BC23-30 · [source at ea08af5e](https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Projects/Project/WIP/JobWIPTotals.Page.al) · facts from BC29

## Properties

| Property | Value |
|---|---|
| Caption | Project WIP Totals |
| SourceTable | Job WIP Total |
| PageType | ListPart |

## Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control's own, else the bound field's (marked).

| Group | Control | Shows | ToolTip |
|---|---|---|---|
| Group | Job Task No. | [Job Task No.](../table/1021.md#fields) | Specifies the number of the project task that is associated with the project WIP total. The project task number is generally the final task in a group of tasks that is set to Total or the last project task line. <small>from the table field</small> |
|  | WIP Method | [WIP Method](../table/1021.md#fields) | Specifies the name of the work in process (WIP) calculation method that is associated with a project. The value in the field comes from the WIP method specified on the project card. <small>from the table field</small> |
|  | WIP Posting Date | [WIP Posting Date](../table/1021.md#fields) | Specifies the date when work in process (WIP) was last calculated and entered in the Project WIP Entries window. <small>from the table field</small> |
|  | WIP Warnings | [WIP Warnings](../table/1021.md#fields) | Specifies if there are WIP warnings associated with a project for which you have calculated WIP. <small>from the table field</small> |
|  | Schedule (Total Cost) | [Schedule (Total Cost)](../table/1021.md#fields) | Specifies the total of the budgeted costs for the project. |
|  | Schedule (Total Price) | [Schedule (Total Price)](../table/1021.md#fields) | Specifies the total of the budgeted prices for the project. |
|  | Usage (Total Cost) | [Usage (Total Cost)](../table/1021.md#fields) | Specifies project usage in relation to total cost up to the date of the last project WIP calculation. |
|  | Usage (Total Price) | [Usage (Total Price)](../table/1021.md#fields) | Specifies project usage in relation to total price up to the date of the last project WIP calculation. |
|  | Contract (Total Cost) | [Contract (Total Cost)](../table/1021.md#fields) | Specifies the value of the billable in relation to total cost up to the date of the last project WIP calculation. |
|  | Contract (Total Price) | [Contract (Total Price)](../table/1021.md#fields) | Specifies the value of the billable in relation to the total price up to the date of the last project WIP calculation. |
|  | Contract (Invoiced Price) | [Contract (Invoiced Price)](../table/1021.md#fields) | Specifies the price amount that has been invoiced and posted in relation to the billable for the current WIP calculation. |
|  | Contract (Invoiced Cost) | [Contract (Invoiced Cost)](../table/1021.md#fields) | Specifies the cost amount that has been invoiced and posted in relation to the billable for the current WIP calculation. |
|  | Calc. Recog. Sales Amount | [Calc. Recog. Sales Amount](../table/1021.md#fields) | Specifies the calculated sum of recognized sales amounts in the current WIP calculation. <small>from the table field</small> |
|  | Calc. Recog. Costs Amount | [Calc. Recog. Costs Amount](../table/1021.md#fields) | Specifies the calculated sum of recognized costs amounts in the current WIP calculation. <small>from the table field</small> |
|  | Cost Completion % | [Cost Completion %](../table/1021.md#fields) | Specifies the cost completion percentage for project tasks that have been budgeted in the current WIP calculation. <small>from the table field</small> |
|  | Invoiced % | [Invoiced %](../table/1021.md#fields) | Specifies the percentage of contracted project tasks that have been invoiced in the current WIP calculation. <small>from the table field</small> |

## Relations

- source table [Table 1021 "Job WIP Total"](../table/1021.md)

## Pages and codeunits on this table

- [Table 1021 "Job WIP Total"](../table/1021.md) (drill-down page)
- [Table 1021 "Job WIP Total"](../table/1021.md) (lookup page)

## Across versions

- Present in: BC23-30
- Changed (declaration) in: BC24

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

## Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: `bcatlas_resolve_node(object_type: "page", object_name: "Job WIP Totals")`, then `bcatlas_get_procedure_body` or `bcatlas_get_neighbors` on the returned id.
