---
id: object/page/1043
type: object
title: Page 1043 "Get Job Planning Lines"
summary: Page 1043 "Get Job Planning Lines" in Base Application (Microsoft.Projects.Project.Planning). 3 public procedures. Introduced in BC24, still in BC30.
tier: official
language: en
tags:
  - page
  - base application
versions:
  introduced: "24"
  last_changed: null
  deprecated: null
review:
  state: derived
  by: null
  at: null
  flags: []
generated:
  at: "2026-10-11T00:31:51.816Z"
  pipeline: 0.2.0
  prompts: {}
  input_hash: ac69e7dfc08b9d48f74ebc08fea6e43cc1c539f2e643dec7051dd120abbb2f70
evidence:
  - kind: code
    url: https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Projects/Project/Planning/GetJobPlanningLines.Page.al
    title: src/Layers/W1/BaseApp/Projects/Project/Planning/GetJobPlanningLines.Page.al (releases/29.x)
    date: null
    commit: ea08af5ef2d6a9b5c5af4a029288abbe2c883220
    t: null
    quote: null
links:
  learn: []
  objects: []
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
object_type: page
object_id: 1043
name: Get Job Planning Lines
caption: Get Project Planning Lines
namespace: Microsoft.Projects.Project.Planning
app: Base Application
extends: null
first_version: "24"
last_version: "30"
present_in:
  - "24"
  - "25"
  - "26"
  - "27"
  - "28"
  - "29"
  - "30"
changed_in: []
source_major: "29"
obsolete: null
countries: []
ms_search_form_ids: []
counts:
  fields: 0
  procedures: 3
  events: 0
  subscribers: 0
  controls: 52
  actions: 1
relations:
  out: 1
  referenced_by: 0
  pages: 0
  extended_by: 0
  event_subscribers: 0
  calls: 1
  called_by: 0
  implements: 0
---

# Page 1043 "Get Job Planning Lines"

> Page 1043 "Get Job Planning Lines" in Base Application (Microsoft.Projects.Project.Planning). 3 public procedures. Introduced in BC24, still in BC30.

Base Application · Microsoft.Projects.Project.Planning · captioned "Get Project Planning Lines" · BC24-30 · [source at ea08af5e](https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Projects/Project/Planning/GetJobPlanningLines.Page.al) · facts from BC29

## Properties

| Property | Value |
|---|---|
| Caption | Get Project Planning Lines |
| SourceTable | Job Planning Line |
| PageType | List |

## Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control's own, else the bound field's (marked).

| Group | Control | Shows | ToolTip |
|---|---|---|---|
| General | Job No. | [Job No.](../table/1003.md#fields) | Specifies the number of the related project. <small>from the table field</small> |
|  | Job Task No. | [Job Task No.](../table/1003.md#fields) | Specifies the number of the related project task. <small>from the table field</small> |
|  | Line Type | [Line Type](../table/1003.md#fields) | Specifies the type of planning line. <small>from the table field</small> |
|  | Planning Date | [Planning Date](../table/1003.md#fields) | Specifies the date of the planning line. You can use the planning date for filtering the totals of the project, for example, if you want to see the scheduled usage for a specific month of the year. <small>from the table field</small> |
|  | Planned Delivery Date | [Planned Delivery Date](../table/1003.md#fields) | Specifies the date that is planned to deliver the item connected to the project planning line. For a resource, the planned delivery date is the date that the resource performs services with respect to the project. <small>from the table field</small> |
|  | Document No. | [Document No.](../table/1003.md#fields) | Specifies a document number for the planning line. <small>from the table field</small> |
|  | Line No. | [Line No.](../table/1003.md#fields) | Specifies the planning line's entry number. <small>from the table field</small> |
|  | Type | [Type](../table/1003.md#fields) | Specifies the type of account to which the planning line relates. <small>from the table field</small> |
|  | No. | [No.](../table/1003.md#fields) | Specifies the number of the account to which the resource, item or general ledger account is posted, depending on your selection in the Type field. <small>from the table field</small> |
|  | Variant Code | [Variant Code](../table/1003.md#fields) | Specifies the variant of the item on the line. <small>from the table field</small> |
|  | Description | [Description](../table/1003.md#fields) | Specifies a description of project planning line. |
|  | Description 2 | [Description 2](../table/1003.md#fields) | Specifies information in addition to the description. <small>from the table field</small> |
|  | Currency Code | [Currency Code](../table/1003.md#fields) | Specifies the currency that is used on the entry. <small>from the table field</small> |
|  | Location Code | [Location Code](../table/1003.md#fields) | Specifies the location from where inventory items to the customer on the sales document are to be shipped by default. |
|  | Bin Code | [Bin Code](../table/1003.md#fields) | Specifies the bin where the selected item will be put away or picked in warehouse and inventory processes. If you specify a bin code in the To-Project Bin Code field on the Location page, that bin will be suggested when you choose the location. <small>from the table field</small> |
|  | Unit of Measure Code | [Unit of Measure Code](../table/1003.md#fields) | Specifies how each unit of the item or resource is measured, such as in pieces or hours. By default, the value in the Base Unit of Measure field on the item or resource card is inserted. <small>from the table field</small> |
|  | Quantity | [Quantity](../table/1003.md#fields) | Specifies the number of item units, resource hours, general ledger account payments, or cost that have been shipped to the customer. |
|  | Qty. to Assemble | [Qty. to Assemble](../table/1003.md#fields) | Specifies how many units of the project planning line quantity that you want to supply by assembly. <small>from the table field</small> |
|  | Reserved Quantity | [Reserved Quantity](../table/1003.md#fields) | Specifies the quantity of the item that is reserved for the project planning line. <small>from the table field</small> |
|  | Quantity (Base) | [Quantity (Base)](../table/1003.md#fields) | Specifies the quantity expressed in the base units of measure. |
|  | Remaining Qty. | [Remaining Qty.](../table/1003.md#fields) | Specifies the remaining quantity of the resource, item, or G/L Account that remains to complete a project. The quantity is calculated as the difference between Quantity and Qty. Posted. <small>from the table field</small> |
|  | Direct Unit Cost (LCY) | [Direct Unit Cost (LCY)](../table/1003.md#fields) | Specifies the cost, in the local currency, of one unit of the selected item or resource. |
|  | Unit Cost | [Unit Cost](../table/1003.md#fields) | Specifies the cost of one unit of the item or resource on the line. <small>from the table field</small> |
|  | Unit Cost (LCY) | [Unit Cost (LCY)](../table/1003.md#fields) | Specifies the cost, in LCY, of one unit of the item or resource on the line. |
|  | Total Cost | [Total Cost](../table/1003.md#fields) | Specifies the total cost for the planning line. The total cost is in the project currency, which comes from the Currency Code field in the Project Card. <small>from the table field</small> |
|  | Remaining Total Cost | [Remaining Total Cost](../table/1003.md#fields) | Specifies the remaining total cost for the planning line. The total cost is in the project currency, which comes from the Currency Code field in the Project Card. <small>from the table field</small> |
|  | Total Cost (LCY) | [Total Cost (LCY)](../table/1003.md#fields) | Specifies the total cost for the planning line. The amount is in the local currency. |
|  | Remaining Total Cost (LCY) | [Remaining Total Cost (LCY)](../table/1003.md#fields) | Specifies the remaining total cost (LCY) for the planning line. The amount is in the local currency. |
|  | Unit Price | [Unit Price](../table/1003.md#fields) | Specifies the price of one unit of the item or resource. You can enter a price manually or have it entered according to the Price/Profit Calculation field on the related card. <small>from the table field</small> |
|  | Unit Price (LCY) | [Unit Price (LCY)](../table/1003.md#fields) | Specifies the price, in LCY, of one unit of the item or resource. You can enter a price manually or have it entered according to the Price/Profit Calculation field on the related card. |
|  | Line Amount | [Line Amount](../table/1003.md#fields) | Specifies the amount that will be posted to the project ledger. <small>from the table field</small> |
|  | Remaining Line Amount | [Remaining Line Amount](../table/1003.md#fields) | Specifies the amount that will be posted to the project ledger. <small>from the table field</small> |
|  | Line Amount (LCY) | [Line Amount (LCY)](../table/1003.md#fields) | Specifies the amount in the local currency that will be posted to the project ledger. |
|  | Remaining Line Amount (LCY) | [Remaining Line Amount (LCY)](../table/1003.md#fields) | Specifies the amount in the local currency that will be posted to the project ledger. |
|  | Line Discount Amount | [Line Discount Amount](../table/1003.md#fields) | Specifies the discount amount that is granted for the item on the line. <small>from the table field</small> |
|  | Line Discount % | [Line Discount %](../table/1003.md#fields) | Specifies the discount percentage that is granted for the item on the line. <small>from the table field</small> |
|  | Total Price | [Total Price](../table/1003.md#fields) | Specifies the total price in the project currency on the planning line. <small>from the table field</small> |
|  | Total Price (LCY) | [Total Price (LCY)](../table/1003.md#fields) | Specifies the total price on the planning line. The total price is in the local currency. |
|  | Qty. Posted | [Qty. Posted](../table/1003.md#fields) | Specifies the quantity that has been posted to the project ledger, if the Usage Link check box has been selected. <small>from the table field</small> |
|  | Posted Total Cost | [Posted Total Cost](../table/1003.md#fields) | Specifies the total cost that has been posted to the project ledger, if the Usage Link check box has been selected. <small>from the table field</small> |
|  | Posted Total Cost (LCY) | [Posted Total Cost (LCY)](../table/1003.md#fields) | Specifies the total cost (LCY) that has been posted to the project ledger, if the Usage Link check box has been selected. |
|  | Posted Line Amount | [Posted Line Amount](../table/1003.md#fields) | Specifies the amount that has been posted to the project ledger. This field is only filled in if the Apply Usage Link check box selected on the project card. <small>from the table field</small> |
|  | Posted Line Amount (LCY) | [Posted Line Amount (LCY)](../table/1003.md#fields) | Specifies the amount in the local currency that has been posted to the project ledger. This field is only filled in if the Apply Usage Link check box selected on the project card. |
|  | Qty. Transferred to Invoice | [Qty. Transferred to Invoice](../table/1003.md#fields) | Specifies the quantity that has been transferred to a sales invoice or credit memo. <small>from the table field</small> |
|  | Qty. to Transfer to Invoice | [Qty. to Transfer to Invoice](../table/1003.md#fields) | Specifies the quantity you want to transfer to the sales invoice or credit memo. The value in this field is calculated as Quantity - Qty. Transferred to Invoice. <small>from the table field</small> |
|  | Qty. Invoiced | [Qty. Invoiced](../table/1003.md#fields) | Specifies the quantity that been posted through a sales invoice. <small>from the table field</small> |
|  | Qty. to Invoice | [Qty. to Invoice](../table/1003.md#fields) | Specifies the quantity that remains to be invoiced. It is calculated as Quantity - Qty. Invoiced. <small>from the table field</small> |
|  | Invoiced Amount (LCY) | [Invoiced Amount (LCY)](../table/1003.md#fields) | Specifies, in local currency, the sales amount that was invoiced for this planning line. |
|  | Invoiced Cost Amount (LCY) | [Invoiced Cost Amount (LCY)](../table/1003.md#fields) | Specifies, in the local currency, the cost amount that was invoiced for this planning line. |
|  | Serial No. | [Serial No.](../table/1003.md#fields) | Specifies the serial number that is applied to the posted item if the planning line was created from the posting of a project journal line. <small>from the table field</small> |
|  | Lot No. | [Lot No.](../table/1003.md#fields) | Specifies the lot number that is applied to the posted item if the planning line was created from the posting of a project journal line. <small>from the table field</small> |
|  | Job Contract Entry No. | [Job Contract Entry No.](../table/1003.md#fields) | Specifies the entry number of the project planning line that the sales line is linked to. <small>from the table field</small> |

## Actions

| Group | Action | ToolTip | Runs |
|---|---|---|---|
| Project Planning Line | Item Tracking Lines | View or edit serial, lot and package numbers that are assigned to the item on the project planning line. |  |

## Procedures

- `SetSalesHeader(var SalesHeader2: Record "Sales Header")`
- `SetRecords(var TempJobPlanningLine: Record "Job Planning Line" temporary)`
- `CreateLines()`

## Triggers

OnQueryClosePage

## Relations

- source table [Table 1003 "Job Planning Line"](../table/1003.md)

## Calls

From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an `Object::"Name"` argument. Interface dispatch and calls through events are not counted, so the list is not complete.

- [Codeunit 1033 "Job-Process Plan. Lines"](../codeunit/1033.md) (2 calls: `CreateLines → CreateInvLines`, `CreateLines → SetSalesHeader`)

## Across versions

- Present in: BC24-30
- Changed (declaration) in: none

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

## Ask your agent

Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: `bcatlas_resolve_node(object_type: "page", object_name: "Get Job Planning Lines")`, then `bcatlas_get_procedure_body` or `bcatlas_get_neighbors` on the returned id.
