pageAL Developmentofficial - Microsoftderived - from the source, no model text

Page 1114 "Cost Allocation Target List"

Base Application · Microsoft.CostAccounting.Allocation

Across versions

  1. BC23-30present

Neighbourhood 4 connected objects and pages

Table 1107 "Cost Allocation Target" (relates to)Cost Allocation TargetTable 1107 "Cost Allocation Target" (pages and codeunits on it, 2 links)Cost Allocation TargetPage 1109 "Cost Allocation Target Card" (pages and codeunits on it)Cost Allocation Target CardDefining and allocating costs (Learn pages)Defining and allocating costs

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Base Application · Microsoft.CostAccounting.Allocation · BC23-30 · source at ea08af5e · facts from BC29

Properties

Property Value
Caption Cost Allocation Target List
SourceTable Cost Allocation Target
PageType List

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
Control2 Target Cost Type Target Cost Type Specifies the type of target cost.
Target Cost Center Target Cost Center Specifies the target cost center.
Target Cost Object Target Cost Object Specifies the target cost object.
Allocation Target Type Allocation Target Type Specifies if the allocation comes from both budgeted and actual costs, only budgeted costs, or only actual costs.
Percent per Share Percent per Share Specifies the percentage if the chosen Allocation Target Type is Percent per Share.
Amount per Share Amount per Share Specifies the amount if the value in the Allocation Target Type field is Amount per Share.
Static Base Static Base Specifies whether or not the base is static.
Static Weighting Static Weighting Specifies whether the values in the static base are weighted.
Share Share Specifies the values calculated from the Static Base and Static Weighting fields.
Percent Percent Specifies the percentage rate calculated based on all other allocation targets.
Base Base Specifies whether or not the base is static.
No. Filter No. Filter Specifies a filter for the numbers that are included.
Date Filter Code Date Filter Code Specifies a filter to filter the calculation of the dynamic allocation base by dates. You use the Date Filter Code field to define a dynamic date range without using a static date. If the allocation bases are updated, the date filter is automatically updated by using the work date.
Cost Center Filter Cost Center Filter Specifies the cost center code. The code serves as a default value for cost posting that is captured later in the cost journal.
Cost Object Filter Cost Object Filter Specifies the cost object code. The code serves as a default value for cost posting that is captured later in the cost journal.
Group Filter Group Filter Specifies a filter so that the dynamic calculation of the Share field is based on the chosen group. Leave the field blank for static allocation.

Procedures

1 local procedures, no public ones.

Relations

Pages and codeunits on this table

Documented on Microsoft Learn

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Cost Allocation Target List"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 2 sources