Page 20505 "Subcontracting Setup Wizard"
Subcontracting · Microsoft.Manufacturing.Subcontracting
Across versions
- BC23-28not present
- BC29-30present
Neighbourhood 1 connected objects and pages
Subcontracting · Microsoft.Manufacturing.Subcontracting · captioned “Subcontracting Setup” · BC29-30 · source at ea08af5e · facts from BC29
Properties
| Property | Value |
|---|---|
| Caption | Subcontracting Setup |
| SourceTable | Manufacturing Setup |
| PageType | NavigatePage |
| ApplicationArea | All |
Fields on this page
Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).
| Group | Control | Shows | ToolTip |
|---|---|---|---|
| StandardBanner | StandardBannerImage | MediaResourcesStandard."Media Reference" |
Specifies the image for the assisted setup. |
| FinishedBanner | FinishedBannerImage | MediaResourcesDone."Media Reference" |
Specifies the image for the completed assisted setup. |
| Review company defaults | Subcontracting Template Name | Subcontracting Template Name | Specifies the subcontracting worksheet template used to create subcontracting orders from released production order routings. |
| Subcontracting Batch Name | Subcontracting Batch Name | Specifies the subcontracting worksheet batch used to create subcontracting orders from released production order routings. | |
| Create Prod. Order Info Line | Create Prod. Order Info Line | Specifies whether subcontracting purchase orders include an information line for the production order line. | |
| Component Direct Unit Cost | Component Direct Unit Cost | Specifies whether subcontracting purchase orders use standard component pricing or the direct unit cost from the production order component. | |
| Subc. Comp. Transfer Lead Time | Subc. Comp. Transfer Lead Time | Specifies the lead time for transferring components to the subcontractor. | |
| Subc. Default Comp. Location | Subc. Default Comp. Location | Specifies where to get the default location for components supplied to the subcontractor. | |
| ReadyToConfigureStep | Set up subcontractor work centers | WorkCentersLinkLbl |
Open the Work Centers page to set up work centers for subcontractors. |
| Set up vendors | VendorsLinkLbl |
Open the Vendors page to set up subcontractors. | |
| Set up locations | LocationsLinkLbl |
Open the Locations page to set up locations used for subcontracting. | |
| Set up subcontractor prices | SubcontractorPricesLinkLbl |
Open the Subcontractor Prices page. | |
| Set up component supply methods | ComponentSupplyMethodsLinkLbl |
Open the Production BOMs page to specify how components are supplied to subcontractors. | |
| Read the Subcontracting documentation | DocumentationLinkLbl |
Open the documentation for Subcontracting. |
Actions
| Group | Action | ToolTip | Runs |
|---|---|---|---|
| Processing | Back | Return to the previous step. | |
| Next | Continue to the next step. | ||
| Finish | Complete the Subcontracting assisted setup. |
Procedures
4 local procedures, no public ones.
Triggers
OnInit, OnOpenPage, OnQueryClosePage
Relations
- source table Table 99000765 “Manufacturing Setup”
Recent changes
- 2026-08-18 #9892 [main] Bug 644283: Renumber Subcontracting app object ids as it clashes with partner range (main, BC30, refactor)
- 2026-08-03 #9818 [Subcontracting] Added assisted setup guide for initial app configuration (main, BC30, feature, added)
Ask your agent
Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Subcontracting Setup Wizard"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.