pageManufacturingofficial - Microsoftderived - from the source, no model text

Page 20560 "Subc. WIP Ledger Entries"

Subcontracting · Microsoft.Manufacturing.Subcontracting

Across versions

  1. BC23-28not present
  2. BC29-30present

Neighbourhood 2 connected objects and pages

Table 20560 "Subcontractor WIP Ledger Entry" (relates to)Subcontractor WIP Ledger EntryTable 20560 "Subcontractor WIP Ledger Entry" (pages and codeunits on it, 2 links)Subcontractor WIP Ledger Entry

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Subcontracting · Microsoft.Manufacturing.Subcontracting · captioned “Subcontracting WIP Entries” · BC29-30 · source at ea08af5e · facts from BC29

Properties

Property Value
Caption Subcontracting WIP Entries
SourceTable Subcontractor WIP Ledger Entry
PageType List
UsageCategory History
ApplicationArea Subcontracting

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
Group Posting Date Posting Date Specifies the date when the WIP ledger entry was posted. from the table field
Entry Type Entry Type Specifies which type of transaction that the entry is created from. from the table field
Document Type Document Type Specifies the document type that created this entry. from the table field
Document No. Document No. Specifies the document number. from the table field
Document Line No. Document Line No. Specifies the document line number. from the table field
Item No. Item No. Specifies the item number. from the table field
Variant Code Variant Code Specifies the variant code. from the table field
Description Description Specifies a description for the WIP ledger entry. from the table field
Description 2 Description 2 Specifies description 2 for the WIP ledger entry. from the table field
Location Code Location Code Specifies the location where the WIP quantity is tracked. from the table field
Quantity (Base) Quantity (Base) Specifies the WIP quantity in base unit of measure from the table field
Base Unit of Measure Base Unit of Measure Specifies the base unit of measure of the item. from the table field
Prod. Order Status Prod. Order Status Specifies the production order status. from the table field
Prod. Order No. Prod. Order No. Specifies the production order number. from the table field
Prod. Order Line No. Prod. Order Line No. Specifies the production order line number. from the table field
Routing No. Routing No. Specifies the routing number. from the table field
Routing Reference No. Routing Reference No. Specifies the routing reference number. from the table field
Operation No. Operation No. Specifies the operation number. from the table field
Work Center No. Work Center No. Specifies the work center number. from the table field
Entry No. Entry No. Specifies the number of the Subcontractor WIP Ledger Entry. from the table field
In Transit In Transit Specifies whether the WIP quantity is currently in transit. from the table field

Actions

Group Action ToolTip Runs
Processing WIP Adjustment Manually adjust the WIP quantity for the selected WIP ledger entry.

Triggers

OnOpenPage, OnAfterGetCurrRecord

Relations

Pages and codeunits on this table

Recent changes

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Subc. WIP Ledger Entries"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 1 sources