---
id: object/page/223
type: object
title: Page 223 "Resource Statistics"
summary: Page 223 "Resource Statistics" in Base Application (Microsoft.Projects.Resources.Resource). Present since at least BC23, still in BC30.
tier: official
language: en
tags:
  - page
  - base application
versions:
  introduced: null
  last_changed: null
  deprecated: null
review:
  state: derived
  by: null
  at: null
  flags: []
generated:
  at: "2026-10-11T00:31:51.816Z"
  pipeline: 0.2.0
  prompts: {}
  input_hash: 0deca2d94efde67a8fdf6b080efcb557878a34596f053c4f81e3ae6eb92357a7
evidence:
  - kind: code
    url: https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Projects/Resources/Resource/ResourceStatistics.Page.al
    title: src/Layers/W1/BaseApp/Projects/Resources/Resource/ResourceStatistics.Page.al (releases/29.x)
    date: null
    commit: ea08af5ef2d6a9b5c5af4a029288abbe2c883220
    t: null
    quote: null
links:
  learn: []
  objects: []
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
object_type: page
object_id: 223
name: Resource Statistics
namespace: Microsoft.Projects.Resources.Resource
app: Base Application
extends: null
first_version: "23"
last_version: "30"
present_in:
  - "23"
  - "24"
  - "25"
  - "26"
  - "27"
  - "28"
  - "29"
  - "30"
changed_in: []
source_major: "29"
obsolete: null
countries: []
ms_search_form_ids: []
counts:
  fields: 0
  procedures: 1
  events: 0
  subscribers: 0
  controls: 64
  actions: 0
relations:
  out: 1
  referenced_by: 0
  pages: 0
  extended_by: 0
  event_subscribers: 0
  calls: 1
  called_by: 0
  implements: 0
---

# Page 223 "Resource Statistics"

> Page 223 "Resource Statistics" in Base Application (Microsoft.Projects.Resources.Resource). Present since at least BC23, still in BC30.

Base Application · Microsoft.Projects.Resources.Resource · BC23-30 · [source at ea08af5e](https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Projects/Resources/Resource/ResourceStatistics.Page.al) · facts from BC29

## Properties

| Property | Value |
|---|---|
| Caption | Resource Statistics |
| SourceTable | Resource |
| PageType | Card |

## Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control's own, else the bound field's (marked).

| Group | Control | Shows | ToolTip |
|---|---|---|---|
| This Period | ResDateName[1] | `ResDateName[1]` | — |
|  | Capacity | `ResCapacity[1]` | Specifies the scheduled capacity of the resource. The amount is the sum of values in the Quantity field on project planning lines for the resource. |
|  | Unused Capacity | `UnusedCapacity[1]` | Specifies the difference between the capacity and the capacity used. It is calculated as follows: Unused Capacity = Capacity - Charg. Usage + Not Charg. Usage. |
|  | Not Chargeable Usage | `Text000` | Specifies the nonchargeable usage, which is displayed in units of measure. Nonchargeable usage can be posted in the resource journal and the project journal. |
|  | Units | `ResUsageUnits[1] [1]` | Specifies the usage, displayed in the specified unit of measure. |
|  | Price | `ResUsagePrice[1] [1]` | Specifies the price amounts. |
|  | Chargeable Usage | `Text000` | Specifies the chargeable usage. Chargeable usage can be posted in the resource group journal and the project journal. |
|  | Units | `ResUsageUnits[1] [2]` | Specifies the usage, displayed in the specified unit of measure. |
|  | Price | `ResUsagePrice[1] [2]` | Specifies the price amounts. |
|  | Chargeable % (Units) | `ChargeablePct[1]` | Specifies the percentage of usage that applies to chargeable units. It is calculated as follows: Chargeable % = (Chargeable Units + Nonchargeable Units) x 100. |
| This Year | Placeholder2 | `Text000` | — |
|  | Capacity | `ResCapacity[2]` | Specifies the scheduled capacity of the resource. The amount is the sum of values in the Quantity field on project planning lines for the resource. |
|  | Unused Capacity | `UnusedCapacity[2]` | Specifies the difference between the capacity and the capacity used. It is calculated as follows: Unused Capacity = Capacity - Charg. Usage + Not Charg. Usage. |
|  | Placeholder3 | `Text000` | — |
|  | Units | `ResUsageUnits[2] [1]` | Specifies the usage, displayed in the specified unit of measure. |
|  | Price | `ResUsagePrice[2] [1]` | Specifies the price amounts. |
|  | Placeholder4 | `Text000` | — |
|  | Units | `ResUsageUnits[2] [2]` | Specifies the usage, displayed in the specified unit of measure. |
|  | Price | `ResUsagePrice[2] [2]` | Specifies the price amounts. |
|  | Chargeable % (Units) | `ChargeablePct[2]` | Specifies the percentage of usage that applies to chargeable units. It is calculated as follows: Chargeable % = (Chargeable Units + Nonchargeable Units) x 100. |
| Last Year | Placeholder5 | `Text000` | — |
|  | Capacity | `ResCapacity[3]` | Specifies the scheduled capacity of the resource. The amount is the sum of values in the Quantity field on project planning lines for the resource. |
|  | Unused Capacity | `UnusedCapacity[3]` | Specifies the difference between the capacity and the capacity used. It is calculated as follows: Unused Capacity = Capacity - Charg. Usage + Not Charg. Usage. |
|  | Placeholder6 | `Text000` | — |
|  | Units | `ResUsageUnits[3] [1]` | Specifies the usage, displayed in the specified unit of measure. |
|  | Price | `ResUsagePrice[3] [1]` | Specifies the price amounts. |
|  | Placeholder7 | `Text000` | — |
|  | Units | `ResUsageUnits[3] [2]` | Specifies the usage, displayed in the specified unit of measure. |
|  | Price | `ResUsagePrice[3] [2]` | Specifies the price amounts. |
|  | Chargeable % (Units) | `ChargeablePct[3]` | Specifies the percentage of usage that applies to chargeable units. It is calculated as follows: Chargeable % = (Chargeable Units + Nonchargeable Units) x 100. |
| Total | Placeholder8 | `Text000` | — |
|  | Capacity | `ResCapacity[4]` | Specifies the scheduled capacity of the resource. The amount is the sum of values in the Quantity field on project planning lines for the resource. |
|  | Unused Capacity | `UnusedCapacity[4]` | Specifies the difference between the capacity and the capacity used. It is calculated as follows: Unused Capacity = Capacity - Charg. Usage + Not Charg. Usage. |
|  | Placeholder9 | `Text000` | — |
|  | Units | `ResUsageUnits[4] [1]` | Specifies the usage, displayed in the specified unit of measure. |
|  | Price | `ResUsagePrice[4] [1]` | Specifies the price amounts. |
|  | Placeholder11 | `Text000` | — |
|  | Units | `ResUsageUnits[4] [2]` | Specifies the usage, displayed in the specified unit of measure. |
|  | Price | `ResUsagePrice[4] [2]` | Specifies the price amounts. |
|  | Chargeable % (Units) | `ChargeablePct[4]` | Specifies the percentage of usage that applies to chargeable units. It is calculated as follows: Chargeable % = (Chargeable Units + Nonchargeable Units) x 100. |
| This Period | Control3 | `ResDateName[1]` | — |
|  | Invoiced | `UnitPrice[1]` | Specifies the unit prices of postings of the type sale. Sales can be posted in the resource group journal and the sales lines. |
|  | Invoiced % | `InvoicedPct[1]` | Specifies the percentage of invoiced amounts in unit prices. It is calculated as follows: Invoiced % = (Invoiced (LCY) / Usage(Unit Price)) x 100. |
|  | Usage (Cost) | `ResUsageCost[1]` | Specifies values for project usage based on cost. Specifies, based on cost, how much the resources has been used. |
|  | Profit | `Profit[1]` | Specifies the profit amounts. |
|  | Profit % | `ResProfitPct[1]` | Specifies the profit percentages. |
| This Year | Placeholder12 | `Text000` | — |
|  | Invoiced | `UnitPrice[2]` | Specifies the unit prices of postings of the type sale. Sales can be posted in the resource group journal and the sales lines. |
|  | Invoiced % | `InvoicedPct[2]` | Specifies the percentage of invoiced amounts in unit prices. It is calculated as follows: Invoiced % = (Invoiced (LCY) / Usage(Unit Price)) x 100. |
|  | Usage (Cost) | `ResUsageCost[2]` | Specifies values for project usage based on cost. Specifies, based on cost, how much the resources has been used. |
|  | Profit | `Profit[2]` | Specifies the profit amounts. |
|  | Profit % | `ResProfitPct[2]` | Specifies the profit percentages. |
| Last Year | Placeholder14 | `Text000` | — |
|  | Invoiced | `UnitPrice[3]` | Specifies the unit prices of postings of the type sale. Sales can be posted in the resource group journal and the sales lines. |
|  | Invoiced % | `InvoicedPct[3]` | Specifies the percentage of invoiced amounts in unit prices. It is calculated as follows: Invoiced % = (Invoiced (LCY) / Usage(Unit Price)) x 100. |
|  | Usage (Cost) | `ResUsageCost[3]` | Specifies values for project usage based on cost. Specifies, based on cost, how much the resources has been used. |
|  | Profit | `Profit[3]` | Specifies the profit amounts. |
|  | Profit % | `ResProfitPct[3]` | Specifies the profit percentages. |
| Total | placehodler15 | `Text000` | — |
|  | Invoiced | `UnitPrice[4]` | Specifies the unit prices of postings of the type sale. Sales can be posted in the resource group journal and the sales lines. |
|  | Invoiced % | `InvoicedPct[4]` | Specifies the percentage of invoiced amounts in unit prices. It is calculated as follows: Invoiced % = (Invoiced (LCY) / Usage(Unit Price)) x 100. |
|  | Usage (Cost) | `ResUsageCost[4]` | Specifies values for project usage based on cost. Specifies, based on cost, how much the resources has been used. |
|  | Profit | `Profit[4]` | Specifies the profit amounts. |
|  | Profit % | `ResProfitPct[4]` | Specifies the profit percentages. |

## Procedures

1 local procedures, no public ones.

## Triggers

OnAfterGetRecord

## Relations

- source table [Table 156 "Resource"](../table/156.md)

## Calls

From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an `Object::"Name"` argument. Interface dispatch and calls through events are not counted, so the list is not complete.

- [Codeunit 358 "DateFilter-Calc"](../codeunit/358.md) (2 calls: `OnAfterGetRecord → CreateAccountingPeriodFilter`, `OnAfterGetRecord → CreateFiscalYearFilter`)

## Across versions

- Present in: BC23-30
- Changed (declaration) in: none

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

## Ask your agent

Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: `bcatlas_resolve_node(object_type: "page", object_name: "Resource Statistics")`, then `bcatlas_get_procedure_body` or `bcatlas_get_neighbors` on the returned id.
