---
id: object/page/5408
type: object
title: Page 5408 "Prod. Order Routing Lines"
summary: Page 5408 "Prod. Order Routing Lines" in Base Application (Microsoft.Manufacturing.Document). Introduced in BC27, still in BC30.
tier: official
language: en
tags:
  - page
  - base application
versions:
  introduced: "27"
  last_changed: null
  deprecated: null
review:
  state: derived
  by: null
  at: null
  flags: []
generated:
  at: "2026-10-11T00:31:51.816Z"
  pipeline: 0.2.0
  prompts: {}
  input_hash: b03062ba74c922f4f29e5d852fc479587727734112064f00b11eded9312cb1a8
evidence:
  - kind: code
    url: https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Manufacturing/Document/ProdOrderRoutingLines.Page.al
    title: src/Layers/W1/BaseApp/Manufacturing/Document/ProdOrderRoutingLines.Page.al (releases/29.x)
    date: null
    commit: ea08af5ef2d6a9b5c5af4a029288abbe2c883220
    t: null
    quote: null
links:
  learn: []
  objects: []
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
object_type: page
object_id: 5408
name: Prod. Order Routing Lines
namespace: Microsoft.Manufacturing.Document
app: Base Application
extends: null
first_version: "27"
last_version: "30"
present_in:
  - "27"
  - "28"
  - "29"
  - "30"
changed_in: []
source_major: "29"
obsolete: null
countries: []
ms_search_form_ids: []
counts:
  fields: 0
  procedures: 1
  events: 0
  subscribers: 0
  controls: 46
  actions: 7
relations:
  out: 1
  referenced_by: 0
  pages: 0
  extended_by: 0
  event_subscribers: 0
  calls: 1
  called_by: 0
  implements: 0
---

# Page 5408 "Prod. Order Routing Lines"

> Page 5408 "Prod. Order Routing Lines" in Base Application (Microsoft.Manufacturing.Document). Introduced in BC27, still in BC30.

Base Application · Microsoft.Manufacturing.Document · BC27-30 · [source at ea08af5e](https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Manufacturing/Document/ProdOrderRoutingLines.Page.al) · facts from BC29

## Properties

| Property | Value |
|---|---|
| Caption | Prod. Order Routing Lines |
| SourceTable | Prod. Order Routing Line |
| PageType | List |
| UsageCategory | Lists |
| ApplicationArea | Manufacturing |

## Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control's own, else the bound field's (marked).

| Group | Control | Shows | ToolTip |
|---|---|---|---|
| Control1 | Status | [Status](../table/5409.md#fields) | Specifies the status of the production order to which the routing list belongs. |
|  | Prod. Order No. | [Prod. Order No.](../table/5409.md#fields) | Specifies the number of the related production order. <small>from the table field</small> |
|  | Routing No. | [Routing No.](../table/5409.md#fields) | Specifies the routing number. <small>from the table field</small> |
|  | Routing Reference No. | [Routing Reference No.](../table/5409.md#fields) | Specifies that the routing reference number. <small>from the table field</small> |
|  | Schedule Manually | [Schedule Manually](../table/5409.md#fields) | Specifies that the underlying capacity need is recalculated each time a change is made in the schedule of the routing. <small>from the table field</small> |
|  | Operation No. | [Operation No.](../table/5409.md#fields) | Specifies the operation number. <small>from the table field</small> |
|  | Previous Operation No. | [Previous Operation No.](../table/5409.md#fields) | Specifies the previous operation number. <small>from the table field</small> |
|  | Next Operation No. | [Next Operation No.](../table/5409.md#fields) | Specifies the next operation number. <small>from the table field</small> |
|  | Type | [Type](../table/5409.md#fields) | Specifies the type of operation. <small>from the table field</small> |
|  | No. | [No.](../table/5409.md#fields) | Specifies the number of the involved entry or record, according to the specified number series. <small>from the table field</small> |
|  | Description | [Description](../table/5409.md#fields) | Specifies the description of the operation. <small>from the table field</small> |
|  | Description 2 | [Description 2](../table/5409.md#fields) | Specifies additional description text. <small>from the table field</small> |
|  | Flushing Method | [Flushing Method](../table/5409.md#fields) | Specifies the method to use to calculate and handle output at the work or machine center. Manual: Output must be posted manually by using the output journal. Forward: Output is automatically calculated and posted when you change the status of a simulated, planned (or firm planned) production order t... <small>from the table field</small> |
|  | Starting Date-Time | [Starting Date-Time](../table/5409.md#fields) | Specifies the starting date and the starting time, which are combined in a format called "starting date-time". <small>from the table field</small> |
|  | Starting Time | [Starting Time](../table/5409.md#fields) | Specifies the starting time of the routing line (operation). <small>from the table field</small> |
|  | Starting Date | [Starting Date](../table/5409.md#fields) | Specifies the starting date of the routing line (operation). <small>from the table field</small> |
|  | Ending Date-Time | [Ending Date-Time](../table/5409.md#fields) | Specifies the ending date and the ending time, which are combined in a format called "ending date-time". <small>from the table field</small> |
|  | Ending Time | [Ending Time](../table/5409.md#fields) | Specifies the ending time of the routing line (operation). <small>from the table field</small> |
|  | Ending Date | [Ending Date](../table/5409.md#fields) | Specifies the ending date of the routing line (operation). <small>from the table field</small> |
|  | Setup Time | [Setup Time](../table/5409.md#fields) | Specifies the setup time of the operation. <small>from the table field</small> |
|  | Setup Time Unit of Meas. Code | [Setup Time Unit of Meas. Code](../table/5409.md#fields) | Specifies the unit of measure code that applies to the setup time of the operation. |
|  | Run Time | [Run Time](../table/5409.md#fields) | Specifies the run time of the operation. <small>from the table field</small> |
|  | Run Time Unit of Meas. Code | [Run Time Unit of Meas. Code](../table/5409.md#fields) | Specifies the unit of measure code that applies to the run time of the operation. |
|  | Wait Time | [Wait Time](../table/5409.md#fields) | Specifies the wait time after processing. <small>from the table field</small> |
|  | Wait Time Unit of Meas. Code | [Wait Time Unit of Meas. Code](../table/5409.md#fields) | Specifies the unit of measure code that applies to the wait time. <small>from the table field</small> |
|  | Move Time | [Move Time](../table/5409.md#fields) | Specifies the move time. <small>from the table field</small> |
|  | Move Time Unit of Meas. Code | [Move Time Unit of Meas. Code](../table/5409.md#fields) | Specifies the unit of measure code that applies to the move time. <small>from the table field</small> |
|  | Fixed Scrap Quantity | [Fixed Scrap Quantity](../table/5409.md#fields) | Specifies the fixed scrap quantity. <small>from the table field</small> |
|  | Routing Link Code | [Routing Link Code](../table/5409.md#fields) | Specifies a routing link code. <small>from the table field</small> |
|  | Scrap Factor % | [Scrap Factor %](../table/5409.md#fields) | Specifies the scrap factor in percent. <small>from the table field</small> |
|  | Send-Ahead Quantity | [Send-Ahead Quantity](../table/5409.md#fields) | Specifies the send-ahead quantity of the operation. <small>from the table field</small> |
|  | Concurrent Capacities | [Concurrent Capacities](../table/5409.md#fields) | Specifies the concurrent capacity of the operation. <small>from the table field</small> |
|  | Unit Cost per | [Unit Cost per](../table/5409.md#fields) | Specifies the unit cost for this operation if it is different than the unit cost on the work center card. <small>from the table field</small> |
|  | Lot Size | [Lot Size](../table/5409.md#fields) | Specifies the number of items that are included in the same operation at the same time. The run time on routing lines is reduced proportionally to the lot size. For example, if the lot size is two pieces, the run time will be reduced by half. |
|  | Expected Operation Cost Amt. | [Expected Operation Cost Amt.](../table/5409.md#fields) | Specifies the total cost of operations. It is automatically calculated from the capacity need, when a production order is refreshed or replanned. <small>from the table field</small> |
|  | Expected Capacity Ovhd. Cost | [Expected Capacity Ovhd. Cost](../table/5409.md#fields) | Specifies the capacity overhead. It is automatically calculated from the capacity need, when a production order is refreshed or replanned. <small>from the table field</small> |
|  | Expected Capacity Need | `Rec."Expected Capacity Need" / ExpCapacityNeed()` | Specifies the expected capacity need for the production order. |
|  | Routing Status | [Routing Status](../table/5409.md#fields) | Specifies the status of the routing line, such as Planned, In Progress, or Finished. <small>from the table field</small> |
|  | Location Code | [Location Code](../table/5409.md#fields) | Specifies the location where the machine or work center on the production order routing line operates. <small>from the table field</small> |
|  | Open Shop Floor Bin Code | [Open Shop Floor Bin Code](../table/5409.md#fields) | Specifies the corresponding bin at the machine or work center, if the location code matches the setup of that machine or work center. <small>from the table field</small> |
|  | To-Production Bin Code | [To-Production Bin Code](../table/5409.md#fields) | Specifies the bin that holds components with a flushing method, that involves a warehouse activity to bring the items to the bin. <small>from the table field</small> |
|  | From-Production Bin Code | [From-Production Bin Code](../table/5409.md#fields) | Specifies the corresponding bin at the machine or work center if the location code matches the setup of that machine or work center. <small>from the table field</small> |
|  | Posted Output Quantity | [Posted Output Quantity](../table/5409.md#fields) | Specifies the total output quantity that has been posted to the capacity ledger. Value expressed in base unit of measure. <small>from the table field</small> |
|  | Posted Scrap Quantity | [Posted Scrap Quantity](../table/5409.md#fields) | Specifies the total scrap quantity that has been posted to the capacity ledger. Value expressed in base unit of measure. <small>from the table field</small> |
|  | Posted Run Time | [Posted Run Time](../table/5409.md#fields) | Specifies the total run time that has been posted to the capacity ledger. <small>from the table field</small> |
|  | Posted Setup Time | [Posted Setup Time](../table/5409.md#fields) | Specifies the total set up time that has been posted to the capacity ledger. <small>from the table field</small> |

## Actions

| Group | Action | ToolTip | Runs |
|---|---|---|---|
| Line | Show Document | Open the document that the selected line exists on. |  |
|  | Comments | View or add comments for the record. | [Page 99000840 "Prod. Order Rtng. Cmt. Sh."](../page/99000840.md) |
|  | Tools | View or edit information about tools that apply to operations that represent the standard task. | [Page 99000844 "Prod. Order Routing Tools"](../page/99000844.md) |
|  | Personnel | View or edit information about personnel that applies to operations that represent the standard task. | [Page 99000845 "Prod. Order Routing Personnel"](../page/99000845.md) |
|  | Quality Measures | View or edit information about quality measures that apply to operations that represent the standard task. | [Page 99000834 "Prod. Order Rtng Qlty Meas."](../page/99000834.md) |
|  | Allocated Capacity | View the capacity need, which is the sum of the setup time and the run time. The run time is equal to the run time per piece multiplied by the number of pieces in the production order. |  |
| Functions | Order Tracking | Tracks the connection of a supply to its corresponding demand. This can help you find the original demand that created a specific production order or purchase order. |  |

## Procedures

1 local procedures, no public ones.

## Relations

- source table [Table 5409 "Prod. Order Routing Line"](../table/5409.md)

## Calls

From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an `Object::"Name"` argument. Interface dispatch and calls through events are not counted, so the list is not complete.

- [Codeunit 99000755 "Shop Calendar Management"](../codeunit/99000755.md) (1 call: `ExpCapacityNeed → TimeFactor`)

## Across versions

- Present in: BC27-30
- Changed (declaration) in: none

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

## Ask your agent

Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: `bcatlas_resolve_node(object_type: "page", object_name: "Prod. Order Routing Lines")`, then `bcatlas_get_procedure_body` or `bcatlas_get_neighbors` on the returned id.
