Page 6349 "Power BI Workspaces Lookup"
Base Application · System.Integration.PowerBI
Across versions
- BC23-28not present
- BC29added
- BC30unchanged
Neighbourhood 2 connected objects and pages
Base Application · System.Integration.PowerBI · captioned “Power BI Workspaces” · BC29-30 · source at ea08af5e · facts from BC29
Properties
| Property | Value |
|---|---|
| Caption | Power BI Workspaces |
| SourceTable | Power BI Selection Element |
| PageType | List |
Fields on this page
Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).
| Group | Control | Shows | ToolTip |
|---|---|---|---|
| Workspaces | Name | Name | Specifies the name of the Power BI workspace. My Workspace deploys the reports to the current user’s personal workspace. |
Procedures
Initialize(): Initializes the page by populating the source record with the workspaces the user can deploy to.
Triggers
OnOpenPage
Relations
- source table Table 6313 “Power BI Selection Element”
Calls
From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an Object::"Name" argument. Interface dispatch and calls through events are not counted, so the list is not complete.
- Codeunit 6319 “Power BI Workspace Mgt.” (1 call:
Initialize → GetWritableWorkspaces)
Called by
- Codeunit 6319 “Power BI Workspace Mgt.” (1 call:
LookupTargetWorkspace → (object))
Recent changes
- 2026-10-05 #12242 29.x: Removing the restriction of deploying Power BI reports only to evaluation companies (releases/29.x, BC29, feature, added)
- 2026-10-02 #12189 Removing the restriction of deploying Power BI reports only to evaluation companies (main, BC30, feature)
- 2026-09-10 #10348 Adding a Power BI workspace to Company Information to be used when deploying reports (main, BC30, feature, added)
Ask your agent
Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Power BI Workspaces Lookup"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.