Page 9099 "Job WIP/Recognition FactBox"
Base Application · Microsoft.Projects.Project.WIP
Across versions
- BC23present
- BC24declaration changed
- BC25-30unchanged
Neighbourhood 2 connected objects and pages
Base Application · Microsoft.Projects.Project.WIP · captioned “Project Details - WIP/Recognition” · BC23-30 · source at ea08af5e · facts from BC29
Properties
| Property | Value |
|---|---|
| Caption | Project Details - WIP/Recognition |
| SourceTable | Job |
| PageType | CardPart |
Fields on this page
Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).
| Group | Control | Shows | ToolTip |
|---|---|---|---|
| Content | Project No. | No. | Specifies the project number. |
| WIP Posting Date | WIP Posting Date | Specifies the posting date that was entered when the Project Calculate WIP batch job was last run. from the table field | |
| Total WIP Cost Amount | Total WIP Cost Amount | Specifies the total WIP cost amount that was last calculated for the project. The WIP Cost Amount for the project is the value WIP Cost Project WIP Entries less the value of the Recognized Cost Project WIP Entries. For projects with WIP Methods of Sales Value or Percentage of Completion, the WIP Cos… from the table field | |
| Applied Costs G/L Amount | Applied Costs G/L Amount | Specifies the sum of all applied costs of the selected project. | |
| Total WIP Sales Amount | Total WIP Sales Amount | Specifies the total WIP Sales amount that was last calculated for the project. The WIP Sales Amount for the project is the value WIP Sales Project WIP Entries less the value of the Recognized Sales Project WIP Entries. For projects with WIP Methods of Cost Value or Cost of Sales, the WIP Sales Amoun… | |
| Applied Sales G/L Amount | Applied Sales G/L Amount | Specifies the sum of all applied costs of the selected project. | |
| Recog. Costs Amount | Recog. Costs Amount | Specifies the Recognized Cost amount that was last calculated for the project. The Recognized Cost Amount for the project is the sum of the Recognized Cost Project WIP Entries. from the table field | |
| Recog. Sales Amount | Recog. Sales Amount | Specifies the recognized sales amount that was last calculated for the project, which is the sum of the Recognized Sales Project WIP Entries. from the table field | |
| Recog. Profit Amount | Rec.CalcRecognizedProfitAmount() |
Specifies the recognized profit amount for the project. | |
| Recog. Profit % | Rec.CalcRecognizedProfitPercentage() |
Specifies the recognized profit percentage for the project. | |
| Acc. WIP Costs Amount | Rec.CalcAccWIPCostsAmount() |
Specifies the total WIP costs for the project. | |
| Acc. WIP Sales Amount | Rec.CalcAccWIPSalesAmount() |
Specifies the total WIP sales for the project. | |
| Calc. Recog. Sales Amount | Calc. Recog. Sales Amount | Specifies the sum of the recognized costs of the involved project tasks. | |
| Calc. Recog. Costs Amount | Calc. Recog. Costs Amount | Specifies the sum of the recognized costs of the involved project tasks. |
Procedures
1 local procedures, no public ones.
Relations
- source table Table 167 “Job”
Calls
From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an Object::"Name" argument. Interface dispatch and calls through events are not counted, so the list is not complete.
- Page 88 “Job Card” (1 call:
ShowDetails → (object))
Ask your agent
Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Job WIP/Recognition FactBox"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.