pageManufacturingofficial - Microsoftderived - from the source, no model text

Page 99000756 "Work Center Statistics"

Base Application · Microsoft.Manufacturing.WorkCenter

Across versions

  1. BC23-30present

Neighbourhood 3 connected objects and pages

Table 99000754 "Work Center" (relates to)Work CenterCodeunit 358 "DateFilter-Calc" (calls, 2 links)DateFilter-CalcSet up work centers and machine centers (Learn pages)Set up work centers and mach…

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Base Application · Microsoft.Manufacturing.WorkCenter · BC23-30 · source at ea08af5e · facts from BC29

Properties

Property Value
Caption Work Center Statistics
SourceTable Work Center
PageType Card

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
This Period EXPECTED '' —
Total Capacity WorkCtrCapacity[1] Specifies the total capacity of this work center that is planned for the period in question.
Effective Capacity WorkCtrEffCapacity[1] Specifies the effective capacity of this work center that is planned for the period in question.
Efficiency % WorkCtrExpEfficiency[1] Specifies the efficiency % of this work center that is planned for the period in question.
Total Cost WorkCtrExpCost[1] Specifies the total costs of this work center that are planned for the period in question.
ACTUAL '' —
Need WorkCtrActNeed[1] Specifies the actual need of this work center for the period in question.
Efficiency % WorkCtrActEfficiency[1] Specifies the efficiency % of this work center that is planned for the period in question
Total Cost WorkCtrActCost[1] Specifies the actual used total costs for the period in question.
This Year WorkCtrExpectedThisYear '' —
Capacity WorkCtrCapacity[2] Specifies the amount of work that can be done in a specified time period at this work center.
WorkCtrEffCapacity[2] WorkCtrEffCapacity[2] —
WorkCtrExpEfficiency[2] WorkCtrExpEfficiency[2] —
WorkCtrExpCost[2] WorkCtrExpCost[2] —
WorkCtrActualThisYear '' —
WorkCtrActNeed[2] WorkCtrActNeed[2] —
WorkCtrActEfficiency[2] WorkCtrActEfficiency[2] —
WorkCtrActCost[2] WorkCtrActCost[2] —
Last Year WorkCtrExpectedLastYear '' —
Capacity WorkCtrCapacity[3] Specifies the amount of work that can be done in a specified time period at this work center.
WorkCtrEffCapacity[3] WorkCtrEffCapacity[3] —
WorkCtrExpEfficiency[3] WorkCtrExpEfficiency[3] —
WorkCtrExpCost[3] WorkCtrExpCost[3] —
WorkCtrActualLastYear '' —
WorkCtrActNeed[3] WorkCtrActNeed[3] —
WorkCtrActEfficiency[3] WorkCtrActEfficiency[3] —
WorkCtrActCost[3] WorkCtrActCost[3] —
Total WorkCtrExpectedTotal '' —
Capacity WorkCtrCapacity[4] Specifies the amount of work that can be done in a specified time period at this work center.
WorkCtrEffCapacity[4] WorkCtrEffCapacity[4] —
WorkCtrExpEfficiency[4] WorkCtrExpEfficiency[4] —
WorkCtrExpCost[4] WorkCtrExpCost[4] —
WorkCtrActualTotal '' —
WorkCtrActNeed[4] WorkCtrActNeed[4] —
WorkCtrActEfficiency[4] WorkCtrActEfficiency[4] —
WorkCtrActCost[4] WorkCtrActCost[4] —
Prod. Order Capacity (Effective) Capacity (Effective) Specifies the effective available capacity of the work center.
Need (Qty.) Prod. Order Need (Qty.) Specifies the calculated capacity requirements for production orders at this work center.

Procedures

1 local procedures, no public ones.

Triggers

OnAfterGetRecord

Relations

Calls

From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an Object::"Name" argument. Interface dispatch and calls through events are not counted, so the list is not complete.

Documented on Microsoft Learn

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

Ask your agent

Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Work Center Statistics"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 2 sources