Page 99000820 "Prod. Order Capacity Need"
Base Application · Microsoft.Manufacturing.Document
Across versions
- BC23-30present
Neighbourhood 3 connected objects and pages
Base Application · Microsoft.Manufacturing.Document · BC23-30 · source at ea08af5e · facts from BC29
Properties
| Property | Value |
|---|---|
| Caption | Prod. Order Capacity Need |
| SourceTable | Prod. Order Capacity Need |
| PageType | List |
Fields on this page
Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).
| Group | Control | Shows | ToolTip |
|---|---|---|---|
| Control1 | Prod. Order No. | Prod. Order No. | Specifies the number of the related production order. from the table field |
| Type | Type | Specifies the type of capacity need. Here you can see whether this capacity need is for a machine center or a work center. from the table field | |
| No. | No. | Specifies the Number of the machine center or work center depending on the entry in the Type field. from the table field | |
| Starting Time | StartingTime |
Specifies the starting time of the capacity need. | |
| Starting Date-Time | Starting Date-Time | Specifies the date and the starting time, which are combined in a format called “starting date-time”. from the table field | |
| Ending Time | EndingTime |
Specifies the ending time of the capacity need. | |
| Ending Date-Time | Ending Date-Time | Specifies the date and the ending time, which are combined in a format called “ending date-time”. from the table field | |
| Date | CurrDate |
Specifies the date when this capacity need occurred. | |
| Send-Ahead Type | Send-Ahead Type | Specifies if the send-ahead quantity is of type Input, Output, or Both. from the table field | |
| Time Type | Time Type | Specifies the time type of the capacity need. Two options are available: Setup Time and Run Time. from the table field | |
| Allocated Time | Allocated Time | Specifies the capacity need of planned operations. from the table field | |
| Concurrent Capacities | Concurrent Capacities | Specifies the concurrent capacity of the operation. from the table field | |
| Status | Status | Specifies the status of the production order. from the table field | |
| Efficiency | Efficiency | Specifies the efficiency of the production order capacity need. from the table field | |
| Needed time | Needed Time | Specifies how much time is required to meet the needs resulting from the specified capacity. from the table field | |
| Needed Time (ms) | Needed Time (ms) | Specifies how much time (in ms) is required to meet the needs resulting from the specified capacity. | |
| Operation No. | Operation No. | Specifies the operation number. from the table field | |
| Routing No. | Routing No. | Specifies the routing number. from the table field | |
| Work Center No. | Work Center No. | Specifies the work center number of the capacity need. If this capacity need occurs at a machine center that is assigned to a work center, that work center number will be shown here. If the capacity need is for a work center, the No. field and this field will show the same number. from the table field |
Triggers
OnAfterGetRecord, OnInit, OnOpenPage
Relations
- source table Table 5410 “Prod. Order Capacity Need”
Pages and codeunits on this table
- Table 5410 “Prod. Order Capacity Need” (drill-down page)
- Table 5410 “Prod. Order Capacity Need” (lookup page)
Documented on Microsoft Learn
Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).
Ask your agent
Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Prod. Order Capacity Need"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.