pageManufacturingofficial - Microsoftderived - from the source, no model text

Page 99001020 "Temp Prod. Ord. Rtng List"

Base Application · Microsoft.Manufacturing.Wizard

Across versions

  1. BC23-29not present
  2. BC30added

Neighbourhood 1 connected objects and pages

Table 5409 "Prod. Order Routing Line" (relates to)Prod. Order Routing Line

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Base Application · Microsoft.Manufacturing.Wizard · captioned “Production Order Routing Lines” · BC30 · source at f18567dc · facts from BC30

Properties

Property Value
Caption Production Order Routing Lines
SourceTable Prod. Order Routing Line
PageType ListPart

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
Lines Status Status Specifies the status of the production order to which the routing list belongs.
Prod. Order No. Prod. Order No. Specifies the production order number.
Routing No. Routing No. Specifies the routing number.
Routing Reference No. Routing Reference No. Specifies the routing reference number.
Schedule Manually Schedule Manually Specifies whether to schedule the operation manually.
Operation No. Operation No. Specifies the operation number for the routing line.
Previous Operation No. Previous Operation No. Specifies the previous operation number in the routing.
Next Operation No. Next Operation No. Specifies the next operation number in the routing.
Type Type Specifies the type of the routing operation (Work Center or Machine Center).
No. No. Specifies the number of the work center or machine center.
Description Description Specifies a description of the routing operation.
Description 2 Description 2 Specifies additional description of the routing operation.
Flushing Method Flushing Method Specifies how consumption is flushed for this operation.
Starting Date-Time Starting Date-Time Specifies the starting date and time of the operation.
Starting Time Starting Time Specifies the starting time of the operation.
Starting Date Starting Date Specifies the starting date of the operation.
Ending Date-Time Ending Date-Time Specifies the ending date and time of the operation.
Ending Time Ending Time Specifies the ending time of the operation.
Ending Date Ending Date Specifies the ending date of the operation.
Setup Time Setup Time Specifies the setup time for the operation.
Setup Time Unit of Meas. Code Setup Time Unit of Meas. Code Specifies the unit of measure code that applies to the setup time of the operation.
Run Time Run Time Specifies the run time per unit for the operation.
Run Time Unit of Meas. Code Run Time Unit of Meas. Code Specifies the unit of measure code that applies to the run time of the operation.
Wait Time Wait Time Specifies the wait time after the operation.
Wait Time Unit of Meas. Code Wait Time Unit of Meas. Code Specifies the unit of measure code for the wait time.
Move Time Move Time Specifies the move time after the operation.
Move Time Unit of Meas. Code Move Time Unit of Meas. Code Specifies the unit of measure code for the move time.
Fixed Scrap Quantity Fixed Scrap Quantity Specifies the fixed scrap quantity for the operation.
Routing Link Code Routing Link Code Specifies the routing link code to connect this operation to BOM components.
Scrap Factor % Scrap Factor % Specifies the scrap factor percentage for the operation.
Send-Ahead Quantity Send-Ahead Quantity Specifies the send-ahead quantity for the operation.
Concurrent Capacities Concurrent Capacities Specifies the number of concurrent capacities for the operation.
Unit Cost per Unit Cost per Specifies the unit cost per for the operation.
Lot Size Lot Size Specifies the number of items that are included in the same operation at the same time.
Expected Operation Cost Amt. Expected Operation Cost Amt. Specifies the expected operation cost amount.
Expected Capacity Ovhd. Cost Expected Capacity Ovhd. Cost Specifies the expected capacity overhead cost.
Expected Capacity Need Expected Capacity Need Specifies the expected capacity need for the production order.
Routing Status Routing Status Specifies the routing status of the operation.
Location Code Location Code Specifies the location code for the operation.
Open Shop Floor Bin Code Open Shop Floor Bin Code Specifies the open shop floor bin code.
To-Production Bin Code To-Production Bin Code Specifies the to-production bin code.
From-Production Bin Code From-Production Bin Code Specifies the from-production bin code.
Posted Output Quantity Posted Output Quantity Specifies the posted output quantity for the operation.
Posted Scrap Quantity Posted Scrap Quantity Specifies the posted scrap quantity for the operation.
Posted Run Time Posted Run Time Specifies the posted run time for the operation.
Posted Setup Time Posted Setup Time Specifies the posted setup time for the operation.

Procedures

  • SetTempProdOrdRtngLine(var TempProdOrdRtngLine: Record "Prod. Order Routing Line" temporary) (internal): Binds the page list to the provided temporary production order routing line records.

Plus 1 local procedures.

Triggers

OnDeleteRecord, OnNewRecord, OnOpenPage

Relations

Recent changes

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Temp Prod. Ord. Rtng List"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 1 sources