pageextensionManufacturingofficial - Microsoftderived - from the source, no model text

Page extension 20511 "Subc. Planning Comp"

Subcontracting · Microsoft.Manufacturing.Subcontracting

Across versions

  1. BC23-28not present
  2. BC29-30present

Neighbourhood 1 connected objects and pages

Page 99000862 "Planning Components" (relates to)Planning Components

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Subcontracting · Microsoft.Manufacturing.Subcontracting · BC29-30 · source at ea08af5e · facts from BC29

Extends Planning Components.

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
addlast(Control1) Component Supply Method Component Supply Method Specifies how components are supplied to the subcontractor for the planning component. Vendor-supplied - components are provided by the subcontractor. Consignment at Vendor - components are owned by your company but stored at the subcontractor location. Transfer to Vendor - components are sent to th… from the table field

Relations

Recent changes

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "pageextension", object_name: "Subc. Planning Comp"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 1 sources