pageextensionManufacturingofficial - Microsoftderived - from the source, no model text

Page extension 20536 "Subc. Manufacturing Manager RC"

Subcontracting · Microsoft.Manufacturing.Subcontracting

Across versions

  1. BC23-28not present
  2. BC29-30present

Neighbourhood 1 connected objects and pages

Page 8903 "Manufacturing Manager RC" (relates to)Manufacturing Manager RC

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Subcontracting · Microsoft.Manufacturing.Subcontracting · BC29-30 · source at ea08af5e · facts from BC29

Extends Manufacturing Manager RC.

Actions

Group Action ToolTip Runs
Subcontracting Subcontracting Worksheets Calculate the needed production supply, find the production orders that have material ready to send to a subcontractor, and automatically create purchase orders for subcontracted operations from production order routings. Page 20504 “Subc. Subcontracting Worksheet”
Subcontractor Prices View and maintain the prices that subcontractors charge for the operations they perform. Page 20500 “Subcontractor Prices”

Relations

Recent changes

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "pageextension", object_name: "Subc. Manufacturing Manager RC"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 1 sources