---
id: object/table/1021
type: object
title: Table 1021 "Job WIP Total"
summary: Table 1021 "Job WIP Total" in Base Application (Microsoft.Projects.Project.WIP). 21 fields, 1 public procedures. Present since at least BC23, still in BC30, changed in BC24, BC28.
tier: official
language: en
tags:
  - table
  - base application
versions:
  introduced: null
  last_changed: "28"
  deprecated: null
review:
  state: derived
  by: null
  at: null
  flags: []
generated:
  at: "2026-10-11T00:31:51.816Z"
  pipeline: 0.2.0
  prompts: {}
  input_hash: 2a7f76ccfad43f48cf0db472a631430e94311fa042d30f1e4456a731db7a3f3b
evidence:
  - kind: code
    url: https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Projects/Project/WIP/JobWIPTotal.Table.al
    title: src/Layers/W1/BaseApp/Projects/Project/WIP/JobWIPTotal.Table.al (releases/29.x)
    date: null
    commit: ea08af5ef2d6a9b5c5af4a029288abbe2c883220
    t: null
    quote: null
links:
  learn: []
  objects: []
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
object_type: table
object_id: 1021
name: Job WIP Total
caption: Project WIP Total
namespace: Microsoft.Projects.Project.WIP
app: Base Application
extends: null
first_version: "23"
last_version: "30"
present_in:
  - "23"
  - "24"
  - "25"
  - "26"
  - "27"
  - "28"
  - "29"
  - "30"
changed_in:
  - "24"
  - "28"
source_major: "29"
obsolete: null
countries: []
ms_search_form_ids: []
counts:
  fields: 21
  procedures: 1
  events: 0
  subscribers: 0
relations:
  out: 6
  referenced_by: 4
  pages: 1
  extended_by: 0
  event_subscribers: 0
  calls: 0
  called_by: 0
  implements: 0
---

# Table 1021 "Job WIP Total"

> Table 1021 "Job WIP Total" in Base Application (Microsoft.Projects.Project.WIP). 21 fields, 1 public procedures. Present since at least BC23, still in BC30, changed in BC24, BC28.

Base Application · Microsoft.Projects.Project.WIP · captioned "Project WIP Total" · BC23-30 · [source at ea08af5e](https://github.com/microsoft/BCApps/blob/ea08af5ef2d6a9b5c5af4a029288abbe2c883220/src/Layers/W1/BaseApp/Projects/Project/WIP/JobWIPTotal.Table.al) · facts from BC29

## Properties

| Property | Value |
|---|---|
| Caption | Project WIP Total |
| DataClassification | CustomerContent |

## Fields

Explanation: the field's ToolTip in the code; without one, the ToolTip of a page control bound to the field (marked via the page); without that, its Caption (marked caption) when that differs from the name.

| No. | Name | Type | Explanation | Notes |
|---|---|---|---|---|
| 1 | Entry No. | Integer | — | AutoIncrement |
| 2 | Job No. | Code[20] | Project No. <small>caption</small> | TableRelation [Table 167 "Job"](../table/167.md); not editable; NotBlank |
| 3 | Job Task No. | Code[20] | Specifies the number of the project task that is associated with the project WIP total. The project task number is generally the final task in a group of tasks that is set to Total or the last project task line. | TableRelation [Table 1001 "Job Task"](../table/1001.md) ("Job Task"."Job Task No." where("Job No." = field("Job No."))); NotBlank |
| 4 | WIP Method | Code[20] | Specifies the name of the work in process (WIP) calculation method that is associated with a project. The value in the field comes from the WIP method specified on the project card. | TableRelation [Table 1006 "Job WIP Method"](../table/1006.md) ("Job WIP Method".Code); not editable |
| 5 | WIP Posting Date | Date | Specifies the date when work in process (WIP) was last calculated and entered in the Project WIP Entries window. | not editable |
| 6 | WIP Posting Date Filter | Text[250] | — | not editable |
| 7 | WIP Planning Date Filter | Text[250] | — | not editable |
| 8 | WIP Warnings | Boolean | Specifies if there are WIP warnings associated with a project for which you have calculated WIP. | FlowField: exist("Job WIP Warning" where("Job WIP Total Entry No." = field("Entry No."))) |
| 9 | Posted to G/L | Boolean | — |  |
| 10 | Schedule (Total Cost) | Decimal | Specifies the total of the budgeted costs for the project. <small>via [Page 1028 "Job WIP Totals"](../page/1028.md)</small> | not editable |
| 11 | Schedule (Total Price) | Decimal | Specifies the total of the budgeted prices for the project. <small>via [Page 1028 "Job WIP Totals"](../page/1028.md)</small> | not editable |
| 12 | Usage (Total Cost) | Decimal | Specifies project usage in relation to total cost up to the date of the last project WIP calculation. <small>via [Page 1028 "Job WIP Totals"](../page/1028.md)</small> | not editable |
| 13 | Usage (Total Price) | Decimal | Specifies project usage in relation to total price up to the date of the last project WIP calculation. <small>via [Page 1028 "Job WIP Totals"](../page/1028.md)</small> | not editable |
| 14 | Contract (Total Cost) | Decimal | Specifies the value of the billable in relation to total cost up to the date of the last project WIP calculation. <small>via [Page 1028 "Job WIP Totals"](../page/1028.md)</small> | not editable |
| 15 | Contract (Total Price) | Decimal | Specifies the value of the billable in relation to the total price up to the date of the last project WIP calculation. <small>via [Page 1028 "Job WIP Totals"](../page/1028.md)</small> | not editable |
| 16 | Contract (Invoiced Price) | Decimal | Specifies the price amount that has been invoiced and posted in relation to the billable for the current WIP calculation. <small>via [Page 1028 "Job WIP Totals"](../page/1028.md)</small> | not editable |
| 17 | Contract (Invoiced Cost) | Decimal | Specifies the cost amount that has been invoiced and posted in relation to the billable for the current WIP calculation. <small>via [Page 1028 "Job WIP Totals"](../page/1028.md)</small> | not editable |
| 20 | Calc. Recog. Sales Amount | Decimal | Specifies the calculated sum of recognized sales amounts in the current WIP calculation. | not editable |
| 21 | Calc. Recog. Costs Amount | Decimal | Specifies the calculated sum of recognized costs amounts in the current WIP calculation. | not editable |
| 30 | Cost Completion % | Decimal | Specifies the cost completion percentage for project tasks that have been budgeted in the current WIP calculation. | not editable |
| 31 | Invoiced % | Decimal | Specifies the percentage of contracted project tasks that have been invoiced in the current WIP calculation. | not editable |

## Keys

- Key1: Entry No. (clustered)
- Key2: Job No., Job Task No.
- Key3: Job No., Posted to G/L

## Procedures

- `DeleteEntriesForJobTask(JobTask: Record "Job Task")`

## Triggers

OnDelete

## Relations

- drill-down page [Page 1028 "Job WIP Totals"](../page/1028.md)
- lookup page [Page 1028 "Job WIP Totals"](../page/1028.md)
- Job Task No.: TableRelation [Table 1001 "Job Task"](../table/1001.md)
- WIP Method: TableRelation [Table 1006 "Job WIP Method"](../table/1006.md)
- WIP Warnings: CalcFormula [Table 1007 "Job WIP Warning"](../table/1007.md)
- Job No.: TableRelation [Table 167 "Job"](../table/167.md)

## Referenced by

4 fields in 4 objects relate to this table (TableRelation or CalcFormula).

- [Table 1004 "Job WIP Entry"](../table/1004.md): Job WIP Total Entry No.
- [Table 1005 "Job WIP G/L Entry"](../table/1005.md): Job WIP Total Entry No.
- [Table 1007 "Job WIP Warning"](../table/1007.md): Job WIP Total Entry No.
- [Table 1018 "Job WIP Buffer"](../table/1018.md): Job WIP Total Entry No.

## Pages and codeunits on this table

- [Page 1028 "Job WIP Totals"](../page/1028.md) (source table)

## Across versions

- Present in: BC23-30
- Changed (declaration) in: BC24, BC28

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

## Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: `bcatlas_resolve_node(object_type: "table", object_name: "Job WIP Total")`, then `bcatlas_get_procedure_body` or `bcatlas_get_neighbors` on the returned id.
