Table 314 "Resources Setup"
Base Application · Microsoft.Projects.Resources.Setup
Across versions
- BC23present
- BC241 fields changed, 1 fields added
- BC251 fields changed, 1 fields added
- BC262 fields changed, 1 procedures added
- BC27unchanged
- BC286 fields changed
- BC29-30unchanged
Neighbourhood 5 connected objects and pages
Base Application · Microsoft.Projects.Resources.Setup · BC23-30 · source at ea08af5e · facts from BC29
Learn documents this table through its pages: Page 462 “Resources Setup” (3 Learn pages).
Properties
| Property | Value |
|---|---|
| Caption | Resources Setup |
| DataClassification | CustomerContent |
Fields
Explanation: the field’s ToolTip in the code; without one, the ToolTip of a page control bound to the field (marked via the page); without that, its Caption (marked caption) when that differs from the name.
| No. | Name | Type | Explanation | Notes |
|---|---|---|---|---|
| 1 | Primary Key Δ BC26 | Code[10] | — | |
| 2 | Resource Nos. Δ BC28 | Code[20] | Specifies the number series code you can use to assign numbers to resources. | TableRelation Table 308 “No. Series” (No. Series) |
| 950 | Time Sheet Nos. Δ BC28 | Code[20] | Specifies the number series code you can use to assign document numbers to time sheets. | TableRelation Table 308 “No. Series” (No. Series) |
| 951 | Time Sheet First Weekday Δ BC28 | Option | Specifies the first weekday to use on a time sheet. The default is Monday. | OptionCaption: Monday,Tuesday,Wednesday,Thursday,Friday,Saturday,Sunday |
| 952 | Time Sheet by Job Approval Δ BC24 Δ BC28 | Option | Specifies whether time sheets must be approved on a per job basis by the user specified for the job. | OptionCaption: Never,Machine Only,Always |
| 953 | Use New Time Sheet Experience Δ BC25 Δ BC26 | Boolean | — | obsolete Removed 25.0; #if not CLEANSCHEMA25; DataClassification SystemMetadata |
| 954 | Time Sheet Submission Policy + BC24 Δ BC28 | Option | Specifies the policy for submitting time sheets. | OptionCaption: Empty Lines Not Submitted,Stop and Show Empty Line Error |
| 955 | Incl. Time Sheet Date in Jnl. + BC25 Δ BC28 | Boolean | Specifies whether the date of the time sheets entry is included in the description in project journal line. |
Keys
- Key1: Primary Key (clustered)
Procedures
UseLegacyPosting(): Boolean+ BC26
Relations
- drill-down page Page 462 “Resources Setup”
- lookup page Page 462 “Resources Setup”
- Resource Nos.: TableRelation Table 308 “No. Series”
- Time Sheet Nos.: TableRelation Table 308 “No. Series”
Pages and codeunits on this table
- Page 462 “Resources Setup” (source table)
Deprecations
- field Use New Time Sheet Experience: Removed 25.0 (#if not CLEANSCHEMA25), “Replacement of NewTimeSheetExperience feature key until removal of old one.”
Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).
Ask your agent
Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "table", object_name: "Resources Setup"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.