tableProjectsofficial - Microsoftderived - from the source, no model text

Table 5137 "Job Planning Line Archive"

Base Application · Microsoft.Projects.Project.Archive

Across versions

  1. BC23not present
  2. BC24added
  3. BC251 fields removed
  4. BC26unchanged
  5. BC275 fields changed
  6. BC2880 fields changed
  7. BC29-30unchanged

Neighbourhood 27 connected objects and pages

Table 27 "Item" (relates to, 2 links)ItemTable 14 "Location" (relates to)LocationTable 15 "G/L Account" (relates to)G/L AccountTable 152 "Resource Group" (relates to)Resource GroupTable 156 "Resource" (relates to)Table 169 "Job Ledger Entry" (relates to)Job Ledger EntryTable 17 "G/L Entry" (relates to)Table 200 "Work Type" (relates to)Work TypeTable 203 "Res. Ledger Entry" (relates to)Res. Ledger EntryTable 204 "Unit of Measure" (relates to)Unit of MeasureTable 205 "Resource Unit of Measure" (relates to)Resource Unit of MeasureTable 250 "Gen. Business Posting Group" (relates to)Table 251 "Gen. Product Posting Group" (relates to)Gen. Product Posting GroupTable 32 "Item Ledger Entry" (relates to)Item Ledger EntryTable 4 "Currency" (relates to)CurrencyTable 5135 "Job Archive" (relates to)Table 5136 "Job Task Archive" (relates to)Table 5401 "Item Variant" (relates to)Table 5404 "Item Unit of Measure" (relates to)Table 6 "Customer Price Group" (relates to)Table 7 "Standard Text" (relates to)Table 7354 "Bin" (relates to)Table 9 "Country/Region" (relates to)Page 5182 "Job Planning Archive Lines" (pages and codeunits on it, 3 links)Job Planning Archive LinesTable extension 6461 "Serv. Job Planning Line Arch." (extended by)Table 5136 "Job Task Archive" (referenced by, 8 links)Job Task ArchiveTable 5135 "Job Archive" (referenced by, 4 links)

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Base Application · Microsoft.Projects.Project.Archive · captioned “Project Planning Line” · BC24-30 · source at ea08af5e · facts from BC29

Properties

Property Value
Caption Project Planning Line
DataClassification CustomerContent

Fields

Explanation: the field’s ToolTip in the code; without one, the ToolTip of a page control bound to the field (marked via the page); without that, its Caption (marked caption) when that differs from the name.

No. Name Type Explanation Notes
1 Line No. Δ BC28 Integer Specifies the planning line’s entry number. not editable
2 Job No. Δ BC28 Code[20] Specifies the number of the related project. TableRelation Table 5135 “Job Archive” (Job Archive); NotBlank
3 Planning Date Δ BC28 Date Specifies the date of the planning line. You can use the planning date for filtering the totals of the project, for example, if you want to see the scheduled usage for a specific month of the year.
4 Document No. Δ BC28 Code[20] Specifies a document number for the planning line.
5 Type Δ BC28 Enum “Job Planning Line Type” Specifies the type of account to which the planning line relates. enum Enum 1023 “Job Planning Line Type”
7 No. Δ BC28 Code[20] Specifies the number of the account to which the resource, item or general ledger account is posted, depending on your selection in the Type field. TableRelation Table 15 “G/L Account”, Table 156 “Resource”, Table 27 “Item” (if (Type = const(Resource)) Resource else if (Type = const(Item)) Item where(Blocked = const(false)) else if (Type = const(“G/L Account”)) “G/L Account” else if (Type = const(Text)) “Standard Text”)
8 Description Δ BC28 Text[100] Specifies the name of the resource, item, or G/L account to which this entry applies. You can change the description.
9 Quantity Δ BC28 Decimal Specifies the number of units of the resource, item, or general ledger account that should be specified on the planning line. If you later change the No., the quantity you have entered remains on the line.
11 Direct Unit Cost (LCY) Δ BC28 Decimal Specifies the cost, in the local currency, of one unit of the selected item or resource. via Page 5182 “Job Planning Archive Lines”
12 Unit Cost (LCY) Δ BC28 Decimal Specifies the cost, in LCY, of one unit of the item or resource on the line. via Page 5182 “Job Planning Archive Lines” not editable
13 Total Cost (LCY) Δ BC28 Decimal Specifies the total cost for the planning line. The amount is in the local currency. via Page 5182 “Job Planning Archive Lines” not editable
14 Unit Price (LCY) Δ BC28 Decimal Specifies the price, in LCY, of one unit of the item or resource. You can enter a price manually or have it entered according to the Price/Profit Calculation field on the related card. via Page 5182 “Job Planning Archive Lines” not editable
15 Total Price (LCY) Δ BC28 Decimal Specifies the total price on the planning line. The total price is in the local currency. via Page 5182 “Job Planning Archive Lines” not editable
16 Resource Group No. Code[20] — TableRelation Table 152 “Resource Group” (Resource Group); not editable
17 Unit of Measure Code Δ BC28 Code[10] Specifies how each unit of the item or resource is measured, such as in pieces or hours. By default, the value in the Base Unit of Measure field on the item or resource card is inserted. TableRelation Table 204 “Unit of Measure”, Table 205 “Resource Unit of Measure”, Table 5404 “Item Unit of Measure” (if (Type = const(Item)) “Item Unit of Measure”.Code where(“Item No.” = field(“No.”)) else if (Type = const(Resource)) “Resource Unit of Measure”.Code where(“Resource No.” = field(“No.”)) else “Unit of Measure”)
18 Qty. Rounding Precision Δ BC28 Decimal — not editable
19 Qty. Rounding Precision (Base) Δ BC28 Decimal — not editable
20 Location Code Δ BC28 Code[10] Specifies a location code for an item. TableRelation Table 14 “Location” (Location where(“Use As In-Transit” = const(false)))
29 Last Date Modified Date — not editable
30 User ID Δ BC28 Code[50] Specifies the ID of the user who posted the entry, to be used, for example, in the change log. TableRelation User.“User Name”; not editable; DataClassification EndUserIdentifiableInformation
32 Work Type Code Δ BC28 Code[10] Specifies which work type the resource applies to. Prices are updated based on this entry. TableRelation Table 200 “Work Type” (Work Type)
33 Customer Price Group Code[10] — TableRelation Table 6 “Customer Price Group” (Customer Price Group)
79 Country/Region Code Code[10] — TableRelation Table 9 “Country/Region” (Country/Region); not editable
80 Gen. Bus. Posting Group Δ BC28 Code[20] Specifies the vendor’s or customer’s trade type to link transactions made for this business partner with the appropriate general ledger account according to the general posting setup. TableRelation Table 250 “Gen. Business Posting Group” (Gen. Business Posting Group); not editable
81 Gen. Prod. Posting Group Δ BC28 Code[20] Specifies the item’s product type to link transactions made for this item with the appropriate general ledger account according to the general posting setup. TableRelation Table 251 “Gen. Product Posting Group” (Gen. Product Posting Group); not editable
83 Document Date Date —
84 Planning Due Date Date —
900 Qty. to Assemble Δ BC28 Decimal —
901 Qty. to Assemble (Base) Δ BC28 Decimal —
902 Assemble to Order Boolean —
903 BOM Item No. Code[20] — TableRelation Table 27 “Item”
904 Attached to Line No. Integer —
1000 Job Task No. Δ BC28 Code[20] Specifies the number of the related project task. TableRelation Table 5136 “Job Task Archive” (“Job Task Archive”.“Job Task No.” where(“Job No.” = field(“Job No.”))); NotBlank
1001 Line Amount (LCY) Δ BC28 Decimal Specifies the amount in the local currency that will be posted to the project ledger. via Page 5182 “Job Planning Archive Lines” not editable
1002 Unit Cost Δ BC28 Decimal Specifies the cost of one unit of the item or resource on the line.
1003 Total Cost Δ BC28 Decimal Specifies the total cost for the planning line. The total cost is in the project currency, which comes from the Currency Code field in the Project Card. not editable
1004 Unit Price Δ BC28 Decimal Specifies the price of one unit of the item or resource. You can enter a price manually or have it entered according to the Price/Profit Calculation field on the related card.
1005 Total Price Δ BC28 Decimal Specifies the total price in the project currency on the planning line. not editable
1006 Line Amount Δ BC28 Decimal Specifies the amount that will be posted to the project ledger.
1007 Line Discount Amount Δ BC28 Decimal Specifies the discount amount that is granted for the item on the line.
1008 Line Discount Amount (LCY) Δ BC28 Decimal — not editable
1015 Cost Factor Δ BC28 Decimal — not editable
1019 Serial No. Δ BC28 Code[50] Specifies the serial number that is applied to the posted item if the planning line was created from the posting of a project journal line. not editable
1020 Lot No. Δ BC28 Code[50] Specifies the lot number that is applied to the posted item if the planning line was created from the posting of a project journal line. not editable
1021 Line Discount % Δ BC28 Decimal Specifies the discount percentage that is granted for the item on the line.
1022 Line Type Δ BC28 Enum “Job Planning Line Line Type” Specifies the type of planning line. enum Enum 1003 “Job Planning Line Line Type”
1023 Currency Code Code[10] — TableRelation Table 4 “Currency”; not editable
1024 Currency Date Δ BC28 Date Specifies the date that will be used to find the exchange rate for the currency in the Currency Date field.
1025 Currency Factor Δ BC28 Decimal — not editable
1026 Schedule Line Boolean Budget Line caption not editable
1027 Contract Line Δ BC28 Boolean Specifies whether this line is a billable line. not editable
1030 Job Contract Entry No. Δ BC28 Integer Specifies the entry number of the project planning line that the sales line is linked to. not editable
1035 Invoiced Amount (LCY) Δ BC27 Δ BC28 Decimal —
1036 Invoiced Cost Amount (LCY) Δ BC27 Δ BC28 Decimal —
1037 VAT Unit Price Δ BC27 Decimal —
1038 VAT Line Discount Amount Δ BC27 Decimal —
1039 VAT Line Amount Δ BC27 Decimal —
1041 VAT % Δ BC28 Decimal —
1042 Description 2 Δ BC28 Text[50] Specifies information in addition to the description.
1043 Job Ledger Entry No. Integer Project Ledger Entry No. caption TableRelation Table 169 “Job Ledger Entry” (Job Ledger Entry); not editable
1048 Status Enum “Job Planning Line Status” — enum Enum 1048 “Job Planning Line Status”; not editable
1050 Ledger Entry Type Δ BC28 Enum “Job Ledger Entry Type” Specifies the entry type of the project ledger entry associated with the planning line. enum Enum 1026 “Job Ledger Entry Type”
1051 Ledger Entry No. Δ BC28 Integer Specifies the entry number of the project ledger entry associated with the project planning line. TableRelation Table 17 “G/L Entry”, Table 203 “Res. Ledger Entry”, Table 32 “Item Ledger Entry” (if (“Ledger Entry Type” = const(Resource)) “Res. Ledger Entry” else if (“Ledger Entry Type” = const(Item)) “Item Ledger Entry” else if (“Ledger Entry Type” = const(“G/L Account”)) “G/L Entry”)
1052 System-Created Entry Δ BC28 Boolean Specifies that an entry has been created by Business Central and is related to a project ledger entry. The check box is selected automatically.
1053 Usage Link Δ BC28 Boolean Specifies whether the Usage Link field applies to the project planning line. When this check box is selected, usage entries are linked to the project planning line. Selecting this check box creates a link to the project planning line from places where usage has been posted, such as the project journ…
1060 Remaining Qty. Δ BC28 Decimal Specifies the remaining quantity of the resource, item, or G/L Account that remains to complete a project. The quantity is calculated as the difference between Quantity and Qty. Posted. not editable
1061 Remaining Qty. (Base) Δ BC28 Decimal — not editable
1062 Remaining Total Cost Δ BC28 Decimal Specifies the remaining total cost for the planning line. The total cost is in the project currency, which comes from the Currency Code field in the Project Card. not editable
1063 Remaining Total Cost (LCY) Δ BC28 Decimal Specifies the remaining total cost (LCY) for the planning line. The amount is in the local currency. via Page 5182 “Job Planning Archive Lines” not editable
1064 Remaining Line Amount Δ BC28 Decimal Specifies the amount that will be posted to the project ledger. not editable
1065 Remaining Line Amount (LCY) Δ BC28 Decimal Specifies the amount in the local currency that will be posted to the project ledger. via Page 5182 “Job Planning Archive Lines” not editable
1070 Qty. Posted Δ BC28 Decimal Specifies the quantity that has been posted to the project ledger, if the Usage Link check box has been selected. not editable
1071 Qty. to Transfer to Journal Δ BC28 Decimal Specifies the quantity you want to transfer to the project journal. Its default value is calculated as quantity minus the quantity that has already been posted, if the Apply Usage Link check box has been selected.
1072 Posted Total Cost Δ BC28 Decimal Specifies the total cost that has been posted to the project ledger, if the Usage Link check box has been selected. not editable
1073 Posted Total Cost (LCY) Δ BC28 Decimal Specifies the total cost (LCY) that has been posted to the project ledger, if the Usage Link check box has been selected. via Page 5182 “Job Planning Archive Lines” not editable
1074 Posted Line Amount Δ BC28 Decimal Specifies the amount that has been posted to the project ledger. This field is only filled in if the Apply Usage Link check box selected on the project card. not editable
1075 Posted Line Amount (LCY) Δ BC28 Decimal Specifies the amount in the local currency that has been posted to the project ledger. This field is only filled in if the Apply Usage Link check box selected on the project card. via Page 5182 “Job Planning Archive Lines” not editable
1080 Qty. Transferred to Invoice Δ BC28 Decimal —
1081 Qty. to Transfer to Invoice Δ BC28 Decimal Specifies the quantity you want to transfer to the sales invoice or credit memo. The value in this field is calculated as Quantity - Qty. Transferred to Invoice.
1090 Qty. Invoiced Δ BC28 Decimal —
1091 Qty. to Invoice Δ BC28 Decimal Specifies the quantity that remains to be invoiced. It is calculated as Quantity - Qty. Invoiced. not editable
1100 Reserved Quantity Δ BC28 Decimal Specifies the quantity of the item that is reserved for the project planning line.
1101 Reserved Qty. (Base) Δ BC28 Decimal —
1102 Reserve Δ BC28 Enum “Reserve Method” Specifies whether or not a reservation can be made for items on the current line. The field is not applicable if the Type field is set to Resource, Cost, or G/L Account. enum Enum 100 “Reserve Method”
1103 Planned Boolean — not editable
5047 Version No. Integer —
5402 Variant Code Δ BC28 Code[10] Specifies the variant of the item on the line. TableRelation Table 5401 “Item Variant” (if (Type = const(Item)) “Item Variant”.Code where(“Item No.” = field(“No.”), Blocked = const(false)))
5403 Bin Code Δ BC28 Code[20] Specifies the bin where the selected item will be put away or picked in warehouse and inventory processes. If you specify a bin code in the To-Project Bin Code field on the Location page, that bin will be suggested when you choose the location. TableRelation Table 7354 “Bin” (Bin.Code where(“Location Code” = field(“Location Code”)))
5404 Qty. per Unit of Measure Δ BC28 Decimal — not editable
5410 Quantity (Base) Δ BC28 Decimal Specifies the quantity expressed in the base units of measure. via Page 5182 “Job Planning Archive Lines”
5790 Requested Delivery Date Date —
5791 Promised Delivery Date Date —
5794 Planned Delivery Date Δ BC28 Date Specifies the date that is planned to deliver the item connected to the project planning line. For a resource, the planned delivery date is the date that the resource performs services with respect to the project.
6515 Package No. Code[50] — not editable
7000 Price Calculation Method Δ BC28 Enum “Price Calculation Method” Specifies the method that will be used for price calculation in the item journal line. enum Enum 7000 “Price Calculation Method”
7001 Cost Calculation Method Δ BC28 Enum “Price Calculation Method” Specifies the method that will be used for cost calculation in the item journal line. enum Enum 7000 “Price Calculation Method”
7300 Pick Qty. Δ BC28 Decimal —
7301 Qty. Picked Δ BC28 Decimal Specifies the quantity of the item you have picked for the project planning line. not editable
7302 Qty. Picked (Base) Δ BC28 Decimal Specifies the base quantity of the item you have picked for the project planning line. via Page 5182 “Job Planning Archive Lines” not editable
7303 Completely Picked Boolean — not editable
7304 Pick Qty. (Base) Δ BC28 Decimal —
7305 Qty. on Journal Δ BC28 Decimal —

Keys

  • Key1: Job No., Job Task No., Version No., Line No. (clustered)

Relations

Referenced by

12 fields in 2 objects relate to this table (TableRelation or CalcFormula).

  • Table 5136 “Job Task Archive”: Contract (Total Cost), Contract (Total Price), End Date, Remaining (Total Cost), Remaining (Total Price), Schedule (Total Cost), Schedule (Total Price), Start Date
  • Table 5135 “Job Archive”: Completely Picked, Next Invoice Date, Scheduled Res. Gr. Qty., Scheduled Res. Qty.

Pages and codeunits on this table

Extended by

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "table", object_name: "Job Planning Line Archive"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 1 sources