Table 928 "Res. Availability Buffer"
Base Application · Microsoft.Projects.Resources.Analysis
Across versions
- BC23present
- BC242 fields changed
- BC25-27unchanged
- BC2810 fields changed
- BC29-30unchanged
Neighbourhood 3 connected objects and pages
Base Application · Microsoft.Projects.Resources.Analysis · BC23-30 · source at ea08af5e · facts from BC29
Properties
| Property | Value |
|---|---|
| DataClassification | SystemMetadata |
Fields
Explanation: the field’s ToolTip in the code; without one, the ToolTip of a page control bound to the field (marked via the page); without that, its Caption (marked caption) when that differs from the name.
| No. | Name | Type | Explanation | Notes |
|---|---|---|---|---|
| 5 | Period Type | Option | — | OptionCaption: Day,Week,Month,Quarter,Year,Period |
| 6 | Period Name Δ BC28 | Text[50] | Specifies the name of the period shown in the line. | |
| 7 | Period Start Δ BC28 | Date | Specifies a series of dates according to the selected time interval. | |
| 8 | Period End | Date | — | |
| 10 | Capacity Δ BC28 | Decimal | Specifies the total capacity for the corresponding time period. | |
| 11 | Qty. on Order (Job) Δ BC24 Δ BC28 | Decimal | Specifies the amount of measuring units allocated to projects with the status order. via Page 361 “Res. Availability Lines” | |
| 12 | Availability After Orders Δ BC28 | Decimal | Specifies capacity minus the quantity on order. | |
| 13 | Job Quotes Allocation Δ BC24 Δ BC28 | Decimal | Specifies the amount of measuring units allocated to projects with the status quote. via Page 361 “Res. Availability Lines” | |
| 14 | Availability After Quotes Δ BC28 | Decimal | Specifies capacity, minus quantity on order (Project), minus quantity on service order, minus project quotes allocation. | |
| 15 | Qty. on Service Order Δ BC28 | Decimal | Specifies how many units of the item are allocated to service orders, meaning listed on outstanding service order lines. via Page 6007 “Res. Availability Lines (SM)” | |
| 16 | Qty. on Assembly Order Δ BC28 | Decimal | Specifies how many units of the item are allocated to assembly orders, which is how many are listed on outstanding assembly order headers. | |
| 17 | Net Availability Δ BC28 | Decimal | Specifies capacity, minus the quantity on order, minus the projects quotes allocation. |
Keys
- Key1: Period Type, Period Start (clustered)
Pages and codeunits on this table
- Page 361 “Res. Availability Lines” (source table)
- Page 6007 “Res. Availability Lines (SM)” (source table)
- Page 6012 “Res.Gr Availability Lines (SM)” (source table)
Ask your agent
Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "table", object_name: "Res. Availability Buffer"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.