Table 99000866 "Capacity Constrained Resource"
Base Application · Microsoft.Manufacturing.Capacity
Across versions
- BC23present
- BC245 fields changed
- BC25-27unchanged
- BC2810 fields changed
- BC29-30unchanged
Neighbourhood 9 connected objects and pages
Base Application · Microsoft.Manufacturing.Capacity · BC23-30 · source at ea08af5e · facts from BC29
Learn documents this table through its pages: Page 99000866 “Capacity Constrained Resources” (2 Learn pages).
Properties
| Property | Value |
|---|---|
| Caption | Capacity Constrained Resource |
| DataClassification | CustomerContent |
| Permissions | TableData “Prod. Order Capacity Need” = r |
Fields
Explanation: the field’s ToolTip in the code; without one, the ToolTip of a page control bound to the field (marked via the page); without that, its Caption (marked caption) when that differs from the name.
| No. | Name | Type | Explanation | Notes |
|---|---|---|---|---|
| 1 | Capacity No. Δ BC28 | Code[20] | Specifies the number of an existing machine center or work center to assign finite loading to. | TableRelation Table 99000754 “Work Center”, Table 99000758 “Machine Center” (if (“Capacity Type” = const(“Work Center”)) “Work Center” else if (“Capacity Type” = const(“Machine Center”)) “Machine Center”) |
| 2 | Capacity Type Δ BC28 | Enum “Capacity Type” | Specifies the capacity type to apply finite loading to. | enum Enum 5871 “Capacity Type” |
| 3 | Name Δ BC28 | Text[100] | Specifies the name of the work center or machine center associated with the capacity number on this line. | |
| 10 | Critical Load % Δ BC28 | Decimal | Specifies the percentage of the available capacity of a work center or machine center to apply load to. Operations on work centers or machine centers that are set up as constrained resources will always be planned serially. This means that if a constrained resource has multiple capacities, then thos… | |
| 11 | Dampener (% of Total Capacity) Δ BC28 | Decimal | Specifies the tolerance as a percent that you will allow the critical load percent to be exceeded for this work or machine center. via Page 99000866 “Capacity Constrained Resources” | |
| 14 | Work Center No. | Code[20] | — | TableRelation Table 99000754 “Work Center” (Work Center) |
| 39 | Date Filter | Date | — | FlowFilter |
| 40 | Work Shift Filter | Code[10] | — | TableRelation Table 99000750 “Work Shift” (Work Shift); FlowFilter |
| 42 | Capacity (Effective) Δ BC24 Δ BC28 | Decimal | — | FlowField: sum(“Calendar Entry”.“Capacity (Effective)” where(“Capacity Type” = field(“Capacity Type”), “No.” = field(“Capacity No.”), “Work Shift Code” = field(“Work Shift Filter”), Date = field(“Date Filter”))); not editable |
| 44 | Prod. Order Need Qty. Δ BC24 Δ BC28 | Decimal | — | FlowField: sum(“Prod. Order Capacity Need”.“Allocated Time” where(Type = field(“Capacity Type”), “No.” = field(“Capacity No.”), Date = field(“Date Filter”))); not editable |
| 46 | Work Center Load Qty. Δ BC24 Δ BC28 | Decimal | — | FlowField: sum(“Prod. Order Capacity Need”.“Allocated Time” where(“Work Center No.” = field(“Work Center No.”), Date = field(“Date Filter”))); not editable |
| 48 | Prod. Order Need Qty. for Plan Δ BC24 Δ BC28 | Decimal | — | FlowField: sum(“Prod. Order Capacity Need”.“Allocated Time” where(Type = field(“Capacity Type”), “No.” = field(“Capacity No.”), Date = field(“Date Filter”), Active = const(true))); not editable |
| 49 | Work Center Load Qty. for Plan Δ BC24 Δ BC28 | Decimal | — | FlowField: sum(“Prod. Order Capacity Need”.“Allocated Time” where(“Work Center No.” = field(“Work Center No.”), Date = field(“Date Filter”), Active = const(true))); not editable |
Keys
- Key1: Capacity Type, Capacity No. (clustered)
Trigger event subscribers
- OnBeforeInsertEvent: Codeunit 99000788 “Mfg. Experience Tier” BlockInsertCapacityConstrainedResource
Relations
- Prod. Order Need Qty.: CalcFormula Table 5410 “Prod. Order Capacity Need”
- Prod. Order Need Qty. for Plan: CalcFormula Table 5410 “Prod. Order Capacity Need”
- Work Center Load Qty.: CalcFormula Table 5410 “Prod. Order Capacity Need”
- Work Center Load Qty. for Plan: CalcFormula Table 5410 “Prod. Order Capacity Need”
- Work Shift Filter: TableRelation Table 99000750 “Work Shift”
- Capacity No.: TableRelation Table 99000754 “Work Center” (conditional)
- Work Center No.: TableRelation Table 99000754 “Work Center”
- Capacity (Effective): CalcFormula Table 99000757 “Calendar Entry”
- Capacity No.: TableRelation Table 99000758 “Machine Center” (conditional)
Pages and codeunits on this table
- Page 99000866 “Capacity Constrained Resources” (source table)
Ask your agent
Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "table", object_name: "Capacity Constrained Resource"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.