Table extension 20530 "Subc. Planning Rtng. Line"
Subcontracting · Microsoft.Manufacturing.Subcontracting
Across versions
- BC23-28not present
- BC29-30present
Neighbourhood 1 connected objects and pages
Subcontracting · Microsoft.Manufacturing.Subcontracting · BC29-30 · source at ea08af5e · facts from BC29
Extends Planning Routing Line.
Fields
Explanation: the field’s ToolTip in the code; without one, the ToolTip of a page control bound to the field (marked via the page); without that, its Caption (marked caption) when that differs from the name.
| No. | Name | Type | Explanation | Notes |
|---|---|---|---|---|
| 20560 | Transfer WIP Item | Boolean | Specifies whether the production order parent item (WIP item) is transferred to the subcontractor for this operation. | DataClassification CustomerContent |
| 20561 | Transfer Description | Text[100] | Specifies the operation-specific description used on transfer orders for the semi-finished item as it is shipped to the subcontracting location. If empty, the standard description is used. | DataClassification CustomerContent |
| 20562 | Transfer Description 2 | Text[50] | Specifies an additional operation-specific description line used on transfer orders for the semi-finished item as it is shipped to the subcontracting location. | DataClassification CustomerContent |
Relations
Recent changes
- 2026-09-28 #11644 [Subcontracting] Bug 648937: Transfer WIP Item is lost when production orders are created from Planning Worksheet (main, BC30, fix, added)
Ask your agent
Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "tableextension", object_name: "Subc. Planning Rtng. Line"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.