---
id: post/yzhums-com/63708
type: post
title: "Business Central 2025 wave 1 (BC26): Experience improved usability in manufacturing"
summary: Business Central 2025 wave 1 (BC26) enhances manufacturing usability with bulk status changes for production orders, new fields and FactBoxes for faster access to information, bulk printing of production order reports, and Edit in Excel support for the Standard Cost Worksheet page.
tier: community
language: en
tags:
  - manufacturing usability
  - production orders
  - bulk operations
  - factboxes
  - excel integration
  - reporting
system: manufacturing
review:
  state: reviewed
  by: opus
  at: "2026-10-26T06:42:40.305Z"
  flags: []
generated:
  at: "2026-11-18T00:16:36.082Z"
  pipeline: 0.2.0
  prompts:
    extract-post: 1
  input_hash: cafc0ee729f8ce3b624646666e8582a137e7d12672aecc615533b626966dc69a
evidence:
  - kind: blog
    url: https://yzhums.com/63708/
    title: "Business Central 2025 wave 1 (BC26): Experience improved usability in manufacturing"
    date: "2025-05-16"
    commit: null
    t: null
    quote: null
  - kind: blog
    url: https://yzhums.com/63708/
    title: "Business Central 2025 wave 1 (BC26): Experience improved usability in manufacturing"
    date: "2025-05-16"
    commit: null
    t: null
    quote: Productivity increases when processes are easy, so we've improved the usability of several areas within manufacturing.
links:
  learn: []
  objects:
    - object/page/99000914
    - object/page/5841
    - object/page/5832
    - object/page/99000820
    - object/page/99000817
    - object/page/99000800
    - object/page/99000808
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
  related:
    - to: post/yzhums-com/71239
      title: "Business Central 2026 release wave 1 (BC28): Add the Description 2 field to various pages to gain more insight (planning, routing, production order creation, and related processes)"
      label: possibly related
      why: both name Page 99000817 "Prod. Order Routing"
      by: code
    - to: https://learn.microsoft.com/dynamics365/business-central/contoso-coffee/manufacturing/create-new-production-bom-version
      title: Create a New Production BOM and BOM Version
      label: possibly related
      why: names Page 99000800 "Prod. BOM Version List"
      by: code
    - to: post/thedynamicsexplorer-com/37371
      title: Dynamics 365 Business Central – Some Considerations when Changing Standard Cost on an Item Card
      label: possibly related
      why: both name Page 5841 "Standard Cost Worksheet"
      by: code
    - to: https://learn.microsoft.com/dynamics365/business-central/production-how-to-post-capacities
      title: Post capacities
      label: possibly related
      why: names Page 5832 "Capacity Ledger Entries"
      by: code
post_id: "63708"
source_id: yzhums-com
source_name: Dynamics 365 Lab - Yun Zhu
url: https://yzhums.com/63708/
published_at: "2025-05-16T01:18:51.000Z"
author: Yun Zhu
full_text: false
words: 874
quotes:
  - text: Productivity increases when processes are easy, so we've improved the usability of several areas within manufacturing.
    why_it_matters: Establishes the core business value of the BC26 manufacturing improvements by connecting usability enhancements to productivity gains
code_objects_mentioned:
  - page Production Order Component
  - page Change Production Order Status
  - page Standard Cost Worksheet
  - page Production routing lines
  - page Capacity Ledger Entries
  - page Prod. Order Capacity Need
  - page Prod. Order Routing
  - page Prod. BOM Version List
  - page Routing Version List
  - report Production Order – Comp. and Routing
  - report Prod. Order – Job Card
systems:
  - manufacturing
  - inventory
versions_mentioned:
  - BC26
  - 2025 wave 1
preview:
  embeddable: true
  frame_url: null
  image: https://yzhums.com/wp-content/uploads/2025/05/Snipaste_2025-05-15_11-18-21.png
  image_alt: null
  image_w: null
  image_h: null
  site_name: Dynamics 365 Lab
  favicon: https://yzhums.com/wp-content/uploads/2020/08/cropped-logo-3-32x32.png
  probed_at: "2026-10-26T06:20:31.990Z"
---

# Business Central 2025 wave 1 (BC26): Experience improved usability in manufacturing

[Read the post](https://yzhums.com/63708/) · Dynamics 365 Lab - Yun Zhu (Yun Zhu, MVP) · 2025-05-16 · 874 words · tier community · reviewed (checked by Opus)

> Business Central 2025 wave 1 (BC26) enhances manufacturing usability with bulk status changes for production orders, new fields and FactBoxes for faster access to information, bulk printing of production order reports, and Edit in Excel support for the Standard Cost Worksheet page.

## Key points

- Component-Item FactBox on Production Order Component page shows item availability insights when viewing or editing components
- Bulk change production order status across multiple orders with confirmation dialogs to prevent errors
- Print Production Order reports for multiple selected orders at once from list pages
- Edit in Excel capability added to Standard Cost Worksheet for faster data entry
- Multiple new fields added across production order, routing, and capacity pages for better visibility

## Quotes

- "Productivity increases when processes are easy, so we've improved the usability of several areas within manufacturing." (Establishes the core business value of the BC26 manufacturing improvements by connecting usability enhancements to productivity gains)

## AL objects mentioned

As named in the post. A name that matches one object page by exact type and name links to it; the others stay as named.

- page "Production Order Component"
- [page 99000914 "Change Production Order Status"](../../objects/page/99000914.md)
- [page 5841 "Standard Cost Worksheet"](../../objects/page/5841.md)
- page "Production routing lines"
- [page 5832 "Capacity Ledger Entries"](../../objects/page/5832.md)
- [page 99000820 "Prod. Order Capacity Need"](../../objects/page/99000820.md)
- [page 99000817 "Prod. Order Routing"](../../objects/page/99000817.md)
- [page 99000800 "Prod. BOM Version List"](../../objects/page/99000800.md)
- [page 99000808 "Routing Version List"](../../objects/page/99000808.md)
- report "Production Order – Comp. and Routing"
- report "Prod. Order – Job Card"

Not found in BC28-30: page "Production Order Component", page "Production routing lines", report "Production Order – Comp. and Routing", report "Prod. Order – Job Card".

## Possibly related

No source states these links: they share an object, a model read them, or a person found the same subject.

- [Business Central 2026 release wave 1 (BC28): Add the Description 2 field to various pages to gain more insight (planning, routing, production order creation, and related processes)](../../posts/yzhums-com/71239.md) — possibly related: both name Page 99000817 "Prod. Order Routing"
- [Create a New Production BOM and BOM Version](https://learn.microsoft.com/dynamics365/business-central/contoso-coffee/manufacturing/create-new-production-bom-version) — possibly related: names Page 99000800 "Prod. BOM Version List"
- [Dynamics 365 Business Central – Some Considerations when Changing Standard Cost on an Item Card](../../posts/thedynamicsexplorer-com/37371.md) — possibly related: both name Page 5841 "Standard Cost Worksheet"
- [Post capacities](https://learn.microsoft.com/dynamics365/business-central/production-how-to-post-capacities) — possibly related: names Page 5832 "Capacity Ledger Entries"

## Context

- Features: Component-Item FactBox, Bulk production order status change, Bulk report printing, Edit in Excel on Standard Cost Worksheet, Routing link code editing, Routing link code warning, Additional columns on manufacturing pages, Confirmation dialogs for production orders
- Versions: BC26, 2025 wave 1

Source: Dynamics 365 Lab - Yun Zhu, community blog. Summary, key points and quotes are derived (CONTENT-NOTICE.md); read the original for the full text.
