---
id: post/yzhums-com/76546
type: post
title: "Business Central 2026 release wave 2 (BC29): Cancelling a scheduled PTE update install (Next Major/Next Minor) in admin center"
summary: In BC29, a PTE install scheduled from the Business Central admin center (Next Minor or Next Major) can be cancelled using Manage updates and then Cancel scheduled install. Before this, the only option was to re-upload the same version to overwrite the schedule. Cancelling removes that version from the service, and the Operations page then shows the status as Canceled along with the user who cancelled it.
tier: community
language: en
tags:
  - pte management
  - extension deployment
  - admin center
  - scheduled updates
  - extension management
system: administration
review:
  state: reviewed
  by: opus
  at: "2026-10-26T06:38:47.378Z"
  flags: []
generated:
  at: "2026-10-26T05:51:10.938Z"
  pipeline: 0.2.0
  prompts:
    extract-post: 1
  input_hash: 137c56fa66a329a6dd8bd022f36ceabc867b48991f4de33f2b230bb1344e0296
evidence:
  - kind: blog
    url: https://yzhums.com/76546/
    title: "Business Central 2026 release wave 2 (BC29): Cancelling a scheduled PTE update install (Next Major/Next Minor) in admin center"
    date: "2026-10-20"
    commit: null
    t: null
    quote: null
  - kind: blog
    url: https://yzhums.com/76546/
    title: "Business Central 2026 release wave 2 (BC29): Cancelling a scheduled PTE update install (Next Major/Next Minor) in admin center"
    date: "2026-10-20"
    commit: null
    t: null
    quote: Starting from Business Central 2026 wave 1 (BC28.4), we can upload, install, and manage PTEs directly in the admin center.
  - kind: blog
    url: https://yzhums.com/76546/
    title: "Business Central 2026 release wave 2 (BC29): Cancelling a scheduled PTE update install (Next Major/Next Minor) in admin center"
    date: "2026-10-20"
    commit: null
    t: null
    quote: If we schedule the installation of a PTE using this new method (from admin center), it can now be canceled.
  - kind: blog
    url: https://yzhums.com/76546/
    title: "Business Central 2026 release wave 2 (BC29): Cancelling a scheduled PTE update install (Next Major/Next Minor) in admin center"
    date: "2026-10-20"
    commit: null
    t: null
    quote: Canceling the installation will remove this version of the PTE from our services. To reschedule the installation, upload this version again.
links:
  learn: []
  objects: []
  features: []
  topics: []
  localizations: []
  videos: []
  posts: []
  guidelines: []
post_id: "76546"
source_id: yzhums-com
source_name: Dynamics 365 Lab - Yun Zhu
url: https://yzhums.com/76546/
published_at: "2026-10-20T02:06:45.000Z"
author: Yun Zhu
full_text: false
words: 459
quotes:
  - text: Starting from Business Central 2026 wave 1 (BC28.4), we can upload, install, and manage PTEs directly in the admin center.
    why_it_matters: Establishes the new capability introduced in BC28.4 that enables centralized PTE management without using Extension Management page.
  - text: If we schedule the installation of a PTE using this new method (from admin center), it can now be canceled.
    why_it_matters: Highlights the key improvement in BC29 that solves a previous limitation where canceling scheduled installations required workarounds.
  - text: Canceling the installation will remove this version of the PTE from our services. To reschedule the installation, upload this version again.
    why_it_matters: Clarifies the effect of cancellation and the required action if users want to reschedulule the same version.
code_objects_mentioned: []
systems:
  - administration
  - platform
versions_mentioned:
  - BC29
  - BC28.4
preview:
  embeddable: true
  frame_url: null
  image: https://yzhums.com/wp-content/uploads/2026/10/Snipaste_2026-10-19_13-58-17.png
  image_alt: null
  image_w: null
  image_h: null
  site_name: Dynamics 365 Lab
  favicon: https://yzhums.com/wp-content/uploads/2020/08/cropped-logo-3-32x32.png
  probed_at: "2026-10-26T05:58:16.895Z"
---

# Business Central 2026 release wave 2 (BC29): Cancelling a scheduled PTE update install (Next Major/Next Minor) in admin center

[Read the post](https://yzhums.com/76546/) · Dynamics 365 Lab - Yun Zhu (Yun Zhu, MVP) · 2026-10-20 · 459 words · tier community · reviewed (checked by Opus)

> In BC29, a PTE install scheduled from the Business Central admin center (Next Minor or Next Major) can be cancelled using Manage updates and then Cancel scheduled install. Before this, the only option was to re-upload the same version to overwrite the schedule. Cancelling removes that version from the service, and the Operations page then shows the status as Canceled along with the user who cancelled it.

## Key points

- Starting with BC28.4, PTEs can be uploaded, installed, and managed directly in the admin center instead of through Extension Management.
- When scheduling a PTE installation from the admin center, you can now cancel it by clicking Manage updates and selecting Cancel scheduled install.
- Canceling removes the scheduled version from services and requires re-uploading the app file if you want to reschedule.
- The Operations page tracks the status of canceled installations and shows which user canceled them.

## Quotes

- "Starting from Business Central 2026 wave 1 (BC28.4), we can upload, install, and manage PTEs directly in the admin center." (Establishes the new capability introduced in BC28.4 that enables centralized PTE management without using Extension Management page.)
- "If we schedule the installation of a PTE using this new method (from admin center), it can now be canceled." (Highlights the key improvement in BC29 that solves a previous limitation where canceling scheduled installations required workarounds.)
- "Canceling the installation will remove this version of the PTE from our services. To reschedule the installation, upload this version again." (Clarifies the effect of cancellation and the required action if users want to reschedulule the same version.)

## Context

- Features: Upload PTE in admin center, Install PTE in admin center, Manage PTE updates, Cancel scheduled PTE installation, Deployment schedule (Next Major/Next Minor), Operations page tracking
- Versions: BC29, BC28.4

Source: Dynamics 365 Lab - Yun Zhu, community blog. Summary, key points and quotes are derived (CONTENT-NOTICE.md); read the original for the full text.
