#10131 [Extensibility Request] issue 30298: allow production scheduling direction control
Production order line quantity changes can now be extended to control scheduling direction, allowing backward or forward rescheduling instead of only backward scheduling.
- 1files
- 1AL files
- 1objects
Pull request · merged into main (BC30) on 2026-08-13 by AleksandricMarko · 1 file (+20 -3), 1 AL · feature · tier official · reviewed (checked by Opus)
What changed
- Added handled events before quantity validations on Prod. Order Line
- Extensions can now override default backward scheduling behavior
- Allows start dates to remain unchanged when intended by users
- Applies to both Quantity and Quantity (Base) fields
- Extensibility enhancement for manufacturing scheduling control
AL objects touched
- Table 5406 “Prod. Order Line”, Base Application: modified
Context
- Work items: AB#644773
- Labels: Team: SCM, event-request
- Systems: manufacturing
- From the description: “Added handled events before validating Ending Time from Quantity and Quantity (Base), allowing extensions to override the hardcoded backward scheduling path in W1.”
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).