#10174 [Extensibility Request] issue 30137: allow overriding cost share application
An integration event was added to the Cost Shares Breakdown report to allow extensions to override how cost share application calculates and applies cost values to capacity and overhead amounts.
- 1files
- 1AL files
- 1objects
Pull request · merged into main (BC30) on 2026-08-16 by AleksandricMarko · 1 file (+17 -1), 1 AL · feature · tier official · reviewed (checked by Opus)
What changed
- Integration event added to ApplyShareOfCostToCostShareBuffer procedure
- Enables custom costing scenarios to replace standard share calculation logic
- Extracted standard share application into isolated method for override capability
- Event uses IsHandled pattern for extension control
AL objects touched
- Report 5848 “Cost Shares Breakdown”, Base Application: modified
Context
- Work items: AB#639379
- Labels: Team: SCM, event-request
- Systems: manufacturing
- From the description: “Custom costing scenarios need to control how Report 5848 applies an output entry’s share of cost to capacity and overhead amounts.”
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).