Report 5848 "Cost Shares Breakdown"
Base Application · Microsoft.Manufacturing.Reports
Across versions
- BC23-27present
- BC284 events added, 1 procedures added
- BC29declaration changed
- BC30unchanged
Neighbourhood 1 connected objects and pages
Base Application · Microsoft.Manufacturing.Reports · BC23-30 · source at ea08af5e · facts from BC29
Properties
| Property | Value |
|---|---|
| Caption | Cost Shares Breakdown |
| UsageCategory | ReportsAndAnalysis |
| ApplicationArea | Manufacturing |
Events published
OnCalcRemainingQtyOnAfterSetRemainingQty(FromItemLedgerEntry: Record "Item Ledger Entry"; var RemainingQty: Decimal; OldRemainingQty: Decimal)+ BC28 (integration)
Procedures
InitializeRequest(NewStartDate: Date; NewEndDate: Date; NewPrintCostShare: Option; NewShowDetails: Boolean)
Plus 14 local procedures.
Triggers
OnPreReport
Calls
From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an Object::"Name" argument. Interface dispatch and calls through events are not counted, so the list is not complete.
- Codeunit 5896 “Calc. Inventory Adjmt. - Order” (2 calls:
UpdateCostShareBufFromInvAdjmtEntryOrder → CalcActualUsageCosts,UpdateCostShareBufFromInvAdjmtEntryOrder → CalcOutputQty)
Recent changes
- 2026-08-16 #10174 [Extensibility Request] issue 30137: allow overriding cost share application (main, BC30, feature)
- 2026-07-09 #9079 Bug 631472: Cost Shares Breakdown (WIP) does not filter by Item (main, BC30, fix)
Ask your agent
Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "report", object_name: "Cost Shares Breakdown"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.