code change · featureManufacturingofficial - Microsoftreviewed - checked by Opus

#9214 WorkCenter/MachineCenter: add Capacity Shown In to Calendar and Load pages

Work Center and Machine Center Calendar and Load pages now include a Capacity Shown In field to display capacity figures in different units of measure (seconds, minutes, hours, or days), matching the functionality already available on Work Center Group pages.

Pull request · merged into main (BC30) on 2026-11-06 by Busslar (community contribution) · 10 files (+445 -20), 8 AL · feature · tier official · reviewed (checked by Opus)

What changed

  • Added Capacity Shown In field to the Work Center and Machine Center Calendar and Load pages
  • Field initializes from Manufacturing Setup Show Capacity In and lets users switch capacity units
  • Calendar matrix Load() gains a capacity unit parameter and converts Capacity (Effective) with TimeFactor
  • Load lines SetLines() gains a unit parameter; Capacity, Allocated Qty. and Availability After Orders are converted, Load % unchanged
  • Implementation mirrors the existing Work Center Group pages
  • Behaviour changes for users or extensions.

AL objects touched

Context

No source states these links: they share an object, a model read them, or a person found the same subject.

Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).