Page 1028 "Job WIP Totals"
Base Application · Microsoft.Projects.Project.WIP
Across versions
- BC23present
- BC24declaration changed
- BC25-30unchanged
Neighbourhood 2 connected objects and pages
Base Application · Microsoft.Projects.Project.WIP · captioned “Project WIP Totals” · BC23-30 · source at ea08af5e · facts from BC29
Properties
| Property | Value |
|---|---|
| Caption | Project WIP Totals |
| SourceTable | Job WIP Total |
| PageType | ListPart |
Fields on this page
Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).
| Group | Control | Shows | ToolTip |
|---|---|---|---|
| Group | Job Task No. | Job Task No. | Specifies the number of the project task that is associated with the project WIP total. The project task number is generally the final task in a group of tasks that is set to Total or the last project task line. from the table field |
| WIP Method | WIP Method | Specifies the name of the work in process (WIP) calculation method that is associated with a project. The value in the field comes from the WIP method specified on the project card. from the table field | |
| WIP Posting Date | WIP Posting Date | Specifies the date when work in process (WIP) was last calculated and entered in the Project WIP Entries window. from the table field | |
| WIP Warnings | WIP Warnings | Specifies if there are WIP warnings associated with a project for which you have calculated WIP. from the table field | |
| Schedule (Total Cost) | Schedule (Total Cost) | Specifies the total of the budgeted costs for the project. | |
| Schedule (Total Price) | Schedule (Total Price) | Specifies the total of the budgeted prices for the project. | |
| Usage (Total Cost) | Usage (Total Cost) | Specifies project usage in relation to total cost up to the date of the last project WIP calculation. | |
| Usage (Total Price) | Usage (Total Price) | Specifies project usage in relation to total price up to the date of the last project WIP calculation. | |
| Contract (Total Cost) | Contract (Total Cost) | Specifies the value of the billable in relation to total cost up to the date of the last project WIP calculation. | |
| Contract (Total Price) | Contract (Total Price) | Specifies the value of the billable in relation to the total price up to the date of the last project WIP calculation. | |
| Contract (Invoiced Price) | Contract (Invoiced Price) | Specifies the price amount that has been invoiced and posted in relation to the billable for the current WIP calculation. | |
| Contract (Invoiced Cost) | Contract (Invoiced Cost) | Specifies the cost amount that has been invoiced and posted in relation to the billable for the current WIP calculation. | |
| Calc. Recog. Sales Amount | Calc. Recog. Sales Amount | Specifies the calculated sum of recognized sales amounts in the current WIP calculation. from the table field | |
| Calc. Recog. Costs Amount | Calc. Recog. Costs Amount | Specifies the calculated sum of recognized costs amounts in the current WIP calculation. from the table field | |
| Cost Completion % | Cost Completion % | Specifies the cost completion percentage for project tasks that have been budgeted in the current WIP calculation. from the table field | |
| Invoiced % | Invoiced % | Specifies the percentage of contracted project tasks that have been invoiced in the current WIP calculation. from the table field |
Relations
- source table Table 1021 “Job WIP Total”
Pages and codeunits on this table
- Table 1021 “Job WIP Total” (drill-down page)
- Table 1021 “Job WIP Total” (lookup page)
Ask your agent
Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Job WIP Totals"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.