Page 20561 "Subc. WIP Adjustment"

Subcontracting · Microsoft.Manufacturing.Subcontracting

Across versions

  1. BC23-28not present
  2. BC29-30present

Neighbourhood 1 connected objects and pages

Table 20560 "Subcontractor WIP Ledger Entry" (relates to)Subcontractor WIP Ledger Entry

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Subcontracting · Microsoft.Manufacturing.Subcontracting · captioned “WIP Adjustment” · BC29-30 · source at ea08af5e · facts from BC29

Properties

Property Value
Caption WIP Adjustment
SourceTable Subcontractor WIP Ledger Entry
PageType StandardDialog
UsageCategory None
ApplicationArea Subcontracting

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
Adjustment Document Type DocumentType Specifies the document type applied to all created adjustment entries.
Document No. DocumentNo Specifies the document number applied to all created adjustment entries.
Production Order Prod. Order Status Prod. Order Status Specifies the production order status. from the table field
Prod. Order No. Prod. Order No. Specifies the production order number. from the table field
Prod. Order Line No. Prod. Order Line No. Specifies the production order line number. from the table field
Routing No. Routing No. Specifies the routing number. from the table field
Routing Reference No. Routing Reference No. Specifies the routing reference number. from the table field
Operation No. Operation No. Specifies the operation number. from the table field
Work Center No. Work Center No. Specifies the work center number. from the table field
General Location Code Location Code Specifies the location where the WIP quantity is tracked. from the table field
Item No. Item No. Specifies the item number. from the table field
Variant Code Variant Code Specifies the variant code. from the table field
Description Description Specifies a description for the WIP ledger entry. from the table field
Description 2 Description 2 Specifies description 2 for the WIP ledger entry. from the table field
Current Quantity (Base) Quantity (Base) Specifies the current WIP quantity base for this operation and location.
New Quantity (Base) NewQuantityBase Specifies the new target WIP quantity base after adjustment.
Quantity to Adjust (Base) QuantityToAdjustBase Specifies the quantity that will be adjusted (New Quantity (Base) minus Current Quantity (Base)).
Base Unit of Measure Base Unit of Measure Specifies the base unit of measure of the item. from the table field
Lines Prod. Order Status Line Prod. Order Status Specifies the production order status. from the table field
Prod. Order No. Line Prod. Order No. Specifies the production order number. from the table field
Prod. Order Line No. Line Prod. Order Line No. Specifies the production order line number. from the table field
Routing No. Line Routing No. Specifies the routing number. from the table field
Routing Reference No. Line Routing Reference No. Specifies the routing reference number. from the table field
Operation No. Line Operation No. Specifies the operation number. from the table field
Work Center No. Line Work Center No. Specifies the work center number. from the table field
Item No. Line Item No. Specifies the item number. from the table field
Variant Code Line Variant Code Specifies the variant code. from the table field
DescriptionLine Description Specifies a description for the WIP ledger entry. from the table field
Description 2 Line Description 2 Specifies description 2 for the WIP ledger entry. from the table field
Location Code Location Code Specifies the location where the WIP quantity is tracked. from the table field
Current Quantity (Base) Quantity (Base) Specifies the WIP quantity in base unit of measure from the table field
New Quantity (Base) NewQuantityBase Specifies the new target WIP quantity after adjustment.
Qty. to Adjust (Base) QuantityToAdjustBase Specifies the quantity that will be adjusted (New Quantity minus Current Quantity).
Base Unit of Measure Base Unit of Measure Specifies the base unit of measure of the item. from the table field

Procedures

  • SetWIPLedgerEntry(var WIPLedgerEntry: Record "Subcontractor WIP Ledger Entry"): Populates the page source table with one row per (Routing Reference No., Operation No., Location Code) combination, aggregating the current WIP quantity from the supplied ledger entries. Must be called before running the page.
  • SetDocumentNo(DocNo: Code[20])

Plus 5 local procedures.

Triggers

OnAfterGetRecord, OnOpenPage, OnQueryClosePage

Relations

Recent changes

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Subc. WIP Adjustment"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.