#13566 [Subcontracting] Bug 648843: Align feature-handler references with CLEAN28
Existing conditional-compilation guards around SubcFeatureFlagHandler references in the Subcontracting app and its test are aligned with the handler's CLEAN28 boundary and 28.0 obsoletion tag. This covers 425 guards around declarations, calls and the permission entry, plus 17 dependent checks of the cached SubcontractingEnabled variable.
- 81files
- 80AL files
- 80objects
Pull request · merged into main (BC30) on 2026-11-04 by ChethanT · 81 files (+442 -442), 80 AL · refactor · tier official · reviewed (checked by Opus)
What changed
- 425 guards around SubcFeatureFlagHandler declarations, calls and the permission entry changed to the CLEAN28 boundary
- 17 checks of the cached SubcontractingEnabled variable now share that boundary to avoid unresolved references
- Italian legacy-handler references stay under their existing CLEAN27 guards
- Other CLEAN29 guards, obsoletion tags and schema boundaries are unchanged
- Broader cleanup audit tracked separately
AL objects touched
- Codeunit 20515 “Subc. ItemJnlPostLine Ext”, Subcontracting: modified
- Codeunit 20506 “Subc. Notification Mgmt.”, Subcontracting: modified
- Codeunit 20500 “Subc. Session State”, Subcontracting: modified
- Codeunit 20511 “Subc. Synchronize Management”, Subcontracting: modified
- Codeunit 20505 “Subcontracting Management”, Subcontracting: modified
- Codeunit 20521 “Subc. Calc BOM Tree Ext.”, Subcontracting: modified
- Codeunit 20517 “Subc. Calc. Prod. Order Ext.”, Subcontracting: modified
- Codeunit 20514 “Subc. Calc.StandardCost Ext.”, Subcontracting: modified
- Codeunit 20529 “Subc. Calc Subcontracts Ext.”, Subcontracting: modified
- Codeunit 20523 “Subc. Carry Out Action Ext.”, Subcontracting: modified
- Codeunit 20562 “Subc. Comp. Factbox Mgmt.”, Subcontracting: modified
- Report 20504 “Subc. Dispatching List”, Subcontracting: modified
- Codeunit 20522 “Subc. Planning Comp. Ext.”, Subcontracting: modified
- Table extension 20503 “Subc. Planning Comp Ext.”, Subcontracting: modified
- Codeunit 20518 “Subc. Planning Line Mgmt Ext.”, Subcontracting: modified
- Table extension 20531 “Subc. Prod BOM Line Ext.”, Subcontracting: modified
- Codeunit 20559 “Subc. ProdO. Factbox Mgmt.”, Subcontracting: modified
- Codeunit 20530 “Subc. Prod. Ord. Comp. Res.”, Subcontracting: modified
- Codeunit 20524 “Subc. Prod. Order Comp. Ext.”, Subcontracting: modified
- Table extension 20502 “Subc. Prod Order Comp Ext.”, Subcontracting: modified
- Page extension 20503 “Subc. Prod. Order Rtng.”, Subcontracting: modified
- Codeunit 20520 “Subc. Prod. Order Rtng. Ext.”, Subcontracting: modified
- Table extension 20506 “Subc. ProdOrderRtngLine Ext.”, Subcontracting: modified
- Codeunit 20516 “Subc. Req. Wksh. Make Ord.”, Subcontracting: modified
- Codeunit 20561 “Subc. Routing Factbox Mgmt.”, Subcontracting: modified
- Table extension 20560 “Subc. Routing Line”, Subcontracting: modified
- Codeunit 20568 “Subc. Routing Line Ext.”, Subcontracting: modified
- Page extension 20508 “Subc. Routing Lines”, Subcontracting: modified
- Page extension 20509 “Subc. Routing Version Lines”, Subcontracting: modified
- Page extension 20506 “Subc. Work Center Card”, Subcontracting: modified
- Codeunit 20519 “Subc. Work Center Extension”, Subcontracting: modified
- Page extension 20507 “Subc. Work Center List”, Subcontracting: modified
- Codeunit 20532 “Subc. Item Extension”, Subcontracting: modified
- Table extension 20507 “Subc. Vendor”, Subcontracting: modified
- Codeunit 20531 “Subc. Vendor Extension”, Subcontracting: modified
- Permission set 20501 “Subcontract. - Objs”, Subcontracting: modified
- Report 20505 “Subc. Calculate Subcontracts”, Subcontracting: modified
- Report 20502 “Subc. Create SubCReturnOrder”, Subcontracting: modified
- Codeunit 20536 “Subc. ItemChargeAssPurchExt”, Subcontracting: modified
- Codeunit 20508 “Subc. Price Management”, Subcontracting: modified
- Codeunit 20560 “Subc. Purch. Factbox Mgmt.”, Subcontracting: modified
- Page extension 20523 “Subc. Purch. Order”, Subcontracting: modified
- Codeunit 20535 “Subc. Purch. Post Ext”, Subcontracting: modified
- Codeunit 20533 “Subc. Purchase Header Ext”, Subcontracting: modified
- Table extension 20512 “Subc. Purchase Line”, Subcontracting: modified
- Codeunit 20534 “Subc. Purchase Line Ext”, Subcontracting: modified
- Codeunit 20557 “Subc. Purchase Order Creator”, Subcontracting: modified
- Codeunit 20513 “Subc. Req.Line Extension”, Subcontracting: modified
- Table extension 20510 “Subc. RequisitionLine”, Subcontracting: modified
- Table 20500 “Subcontractor Price”, Subcontracting: modified
- Table extension 20501 “Subc. Manufacturing Setup”, Subcontracting: modified
- Report 20501 “Subc. Create Transf. Order”, Subcontracting: modified
- Table extension 20524 “Subc. DirectTransHeader Ext.”, Subcontracting: modified
- Codeunit 20548 “Subc. DirectTransferLine Ext.”, Subcontracting: modified
- Codeunit 20540 “Subc. TransOrderPostRcpt Ext”, Subcontracting: modified
- Codeunit 20539 “Subc. TransOrderPostShpt Ext”, Subcontracting: modified
- Codeunit 20547 “Subc. TransOrderPostTrans Ext”, Subcontracting: modified
- Codeunit 20542 “Subc. Trans Rcpt Header Ext”, Subcontracting: modified
- Codeunit 20543 “Subc. Trans Shpt Header Ext”, Subcontracting: modified
- Table extension 20520 “Subc. Transfer Header”, Subcontracting: modified
- Codeunit 20507 “Subc. Transfer Header Ext.”, Subcontracting: modified
- Table extension 20517 “Subc. Transfer Line”, Subcontracting: modified
- Codeunit 20544 “Subc. Transfer Line Ext.”, Subcontracting: modified
- Codeunit 20504 “Subc. Transfer Management”, Subcontracting: modified
- Page extension 20526 “Subc. Transfer Order”, Subcontracting: modified
- Codeunit 20538 “Subc. Transfer Rcpt Line Ext.”, Subcontracting: modified
- Codeunit 20537 “Subc. Transfer Shpt Line Ext.”, Subcontracting: modified
- Codeunit 20549 “Subc. Change Prod.Order Status”, Subcontracting: modified
- Page extension 20544 “Subc.Change Status Prod. Order”, Subcontracting: modified
- Codeunit 20565 “Subc. Posting Preview Binding”, Subcontracting: modified
- Codeunit 20566 “Subc. Posting Preview Subscr.”, Subcontracting: modified
- Codeunit 20567 “Subc. Pst. Prev. Event Handler”, Subcontracting: modified
- Codeunit 20541 “Subc. Transfer WIP Posting”, Subcontracting: modified
- Page 20561 “Subc. WIP Adjustment”, Subcontracting: modified
- Codeunit 20564 “Subc. WIP Item Ledg Find Entry”, Subcontracting: modified
- Table 20560 “Subcontractor WIP Ledger Entry”, Subcontracting: modified
- Codeunit 20551 “Subc. WhsePostReceipt Ext”, Subcontracting: modified
- Codeunit 20563 “Subc. WhsePostShipment Ext”, Subcontracting: modified
- Codeunit 20550 “Subc. WhsePurchRelease Ext”, Subcontracting: modified
- Codeunit 20558 “Subc. Worksheet Handler”, Subcontracting: modified
Context
- Work items: AB#648843, AB#657860
- Labels: AL: Apps (W1), Team: SCM
- Systems: manufacturing
Possibly related
No source states these links: they share an object, a model read them, or a person found the same subject.
- Deprecated features in the application — possibly related: touches Report 20505 “Subc. Calculate Subcontracts”
- Order subcontracting — possibly related: Order subcontracting process and routing management affected by feature-handler alignment changes. (model-linked)
- Transfer WIP items between subcontractors — possibly related: Transfer WIP items between subcontractors, core subcontracting feature touched by this alignment update. (model-linked)
Source: metadata of a merged pull request in microsoft/BCApps (bcapps): title, labels, changed paths and counts, with a summary in our words. No source text and no description beyond one short quote (D10, D61).