pageProjectsofficial - Microsoftderived - from the source, no model text

Page 362 "Res. Gr. Availability Lines"

Base Application · Microsoft.Projects.Resources.Analysis

Across versions

  1. BC23present
  2. BC241 events changed
  3. BC25-30unchanged

Neighbourhood 4 connected objects and pages

Table 920 "Res. Gr. Availability Buffer" (relates to)Res. Gr. Availability BufferPage extension 6465 "Serv. Res. Gr. Avail. Lines" (extended by)Serv. Res. Gr. Avail. LinesCodeunit 6450 "Serv. Integration Mgt." (event subscribers)Serv. Integration Mgt.Codeunit 920 "Period Form Lines Mgt." (calls, 2 links)Period Form Lines Mgt.

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Base Application · Microsoft.Projects.Resources.Analysis · captioned “Lines” · BC23-30 · source at ea08af5e · facts from BC29

Properties

Property Value
Caption Lines
SourceTable Res. Gr. Availability Buffer
PageType ListPart

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
Control1 Period Start Period Start Specifies the start date of the period defined on the line for the resource group.
Period Name Period Name Specifies the name of the period shown in the line. from the table field
Capacity Capacity Specifies the total capacity for the corresponding time period. from the table field
Qty. on Order Qty. on Order (Job) Specifies the amount of measuring units allocated to projects with the status order.
Availability After Orders Availability After Orders Specifies the capacity minus the quantity on order. from the table field
Project Quotes Allocation Qty. Quoted (Job) Specifies the amount of measuring units allocated to projects with the status quote.
Net Availability Net Availability Specifies capacity, minus the quantity on order (Project), minus quantity on Service Order, minus Project Quotes Allocation. from the table field

Events published

  • OnAfterCalcLine(var ResourceGroup: Record "Resource Group"; var CapacityAfterOrders: Decimal; var CapacityAfterQuotes: Decimal; var ResGrAvailabilityBuffer: Record "Res. Gr. Availability Buffer") Δ BC24 (integration)

Procedures

  • SetLines(var NewResGr: Record "Resource Group"; NewPeriodType: Enum "Analysis Period Type"; NewAmountType: Enum "Analysis Amount Type")

Plus 2 local procedures.

Triggers

OnAfterGetRecord, OnFindRecord, OnNextRecord, OnOpenPage

Relations

Extended by

Calls

From the extracted call graph of BC29 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an Object::"Name" argument. Interface dispatch and calls through events are not counted, so the list is not complete.

Ask your agent

Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC29 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Res. Gr. Availability Lines"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 1 sources