tableProjectsofficial - Microsoftderived - from the source, no model text

Table 920 "Res. Gr. Availability Buffer"

Base Application · Microsoft.Projects.Resources.Analysis

Across versions

  1. BC23present
  2. BC241 fields changed
  3. BC25-27unchanged
  4. BC288 fields changed
  5. BC29-30unchanged

Neighbourhood 1 connected objects and pages

Page 362 "Res. Gr. Availability Lines" (pages and codeunits on it)Res. Gr. Availability Lines

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Base Application · Microsoft.Projects.Resources.Analysis · BC23-30 · source at ea08af5e · facts from BC29

Properties

Property Value
DataClassification SystemMetadata

Fields

Explanation: the field’s ToolTip in the code; without one, the ToolTip of a page control bound to the field (marked via the page); without that, its Caption (marked caption) when that differs from the name.

No. Name Type Explanation Notes
1 Resource Group No. Code[20] —
5 Period Type Option — OptionCaption: Day,Week,Month,Quarter,Year,Period
6 Period Name Δ BC28 Text[50] Specifies the name of the period shown in the line.
7 Period Start Δ BC28 Date Specifies the start date of the period defined on the line for the resource group.
8 Period End Date —
10 Capacity Δ BC28 Decimal Specifies the total capacity for the corresponding time period.
11 Qty. on Order (Job) Δ BC28 Decimal Specifies the amount of measuring units allocated to projects with the status order. via Page 362 “Res. Gr. Availability Lines”
12 Qty. on Service Order Δ BC28 Decimal Specifies the amount of measuring units allocated to service orders. via Page extension 6465 “Serv. Res. Gr. Avail. Lines”
13 Availability After Orders Δ BC28 Decimal Specifies the capacity minus the quantity on order.
14 Qty. Quoted (Job) Δ BC24 Δ BC28 Decimal Specifies the amount of measuring units allocated to projects with the status quote. via Page 362 “Res. Gr. Availability Lines”
15 Net Availability Δ BC28 Decimal Specifies capacity, minus the quantity on order (Project), minus quantity on Service Order, minus Project Quotes Allocation.

Keys

  • Key1: Period Type, Period Start (clustered)

Pages and codeunits on this table

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "table", object_name: "Res. Gr. Availability Buffer"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 1 sources