pageManufacturingofficial - Microsoftderived - from the source, no model text

Page 99000916 "Machine Center Task List"

Base Application · Microsoft.Manufacturing.MachineCenter

Across versions

  1. BC23-30present

Neighbourhood 2 connected objects and pages

Table 5409 "Prod. Order Routing Line" (relates to)Prod. Order Routing LineView Load on Work and Machine Centers (Learn pages)View Load on Work and Machin…

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Base Application · Microsoft.Manufacturing.MachineCenter · BC23-30 · source at ea08af5e · facts from BC29

Properties

Property Value
Caption Machine Center Task List
SourceTable Prod. Order Routing Line
PageType List

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
Control1 Status Status Specifies the status of the routing line. from the table field
Prod. Order No. Prod. Order No. Specifies the number of the related production order. from the table field
Operation No. Operation No. Specifies the operation number. from the table field
Description Description Specifies the description of the operation. from the table field
Description 2 Description 2 Specifies additional description text. from the table field
Setup Time Setup Time Specifies the setup time of the operation. from the table field
Setup Time Unit of Meas. Code Setup Time Unit of Meas. Code Specifies the setup time unit of measure. from the table field
Run Time Run Time Specifies the run time of the operation. from the table field
Run Time Unit of Meas. Code Run Time Unit of Meas. Code Specifies the run time unit of measure. from the table field
Wait Time Wait Time Specifies the wait time after processing. from the table field
Wait Time Unit of Meas. Code Wait Time Unit of Meas. Code Specifies the wait time unit of measure.
Move Time Move Time Specifies the move time. from the table field
Move Time Unit of Meas. Code Move Time Unit of Meas. Code Specifies the move time unit of measure.
Starting Time Starting Time Specifies the starting time of the routing line (operation). from the table field
Starting Date Starting Date Specifies the starting date of the routing line (operation). from the table field
Ending Time Ending Time Specifies the ending time of the routing line (operation). from the table field
Ending Date Ending Date Specifies the ending date of the routing line (operation). from the table field
Fixed Scrap Quantity Fixed Scrap Quantity Specifies the fixed scrap quantity. from the table field
Lot Size Lot Size Specifies the lot size. from the table field
Scrap Factor % Scrap Factor % Specifies the scrap factor in percent. from the table field
Concurrent Capacities Concurrent Capacities Specifies the concurrent capacity of the operation. from the table field
Send-Ahead Quantity Send-Ahead Quantity Specifies the send-ahead quantity of the operation. from the table field
Routing Link Code Routing Link Code Specifies a routing link code. from the table field
Unit Cost per Unit Cost per Specifies the unit cost for this operation if it is different than the unit cost on the work center or machine center card.

Actions

Group Action ToolTip Runs
Mach. Ctr. Capacity Ledger Entries View the capacity ledger entries of the involved production order. Capacity is recorded either as time (run time, stop time, or setup time) or as quantity (scrap quantity or output quantity). Page 5832 “Capacity Ledger Entries”
Comments View or add comments for the record. Page 99000784 “Manufacturing Comment Sheet”
Load View the availability of the machine or work center, including its the capacity, the allocated quantity, availability after orders, and the load in percent of its total capacity. Page 99000889 “Machine Center Load”
Statistics View statistical information, such as the value of posted entries, for the record. Page 99000762 “Machine Center Statistics”
Functions Move Move the selected task to another machine center.
Order Tracking Tracks the connection of a supply to its corresponding demand. This can help you find the original demand that created a specific production order or purchase order.

Relations

Documented on Microsoft Learn

Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Machine Center Task List"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 2 sources