Page 99000915 "Work Center Task List"
Base Application · Microsoft.Manufacturing.WorkCenter
Across versions
- BC23-24present
- BC25declaration changed
- BC26-30unchanged
Neighbourhood 2 connected objects and pages
Base Application · Microsoft.Manufacturing.WorkCenter · BC23-30 · source at ea08af5e · facts from BC29
Properties
| Property | Value |
|---|---|
| Caption | Work Center Task List |
| SourceTable | Prod. Order Routing Line |
| PageType | List |
| UsageCategory | Lists |
| ApplicationArea | Manufacturing |
Fields on this page
Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).
| Group | Control | Shows | ToolTip |
|---|---|---|---|
| Control1 | Status | Status | Specifies the status of the routing line. from the table field |
| Prod. Order No. | Prod. Order No. | Specifies the number of the related production order. from the table field | |
| Operation No. | Operation No. | Specifies the operation number. from the table field | |
| Description | Description | Specifies the description of the operation. from the table field | |
| Description 2 | Description 2 | Specifies additional description text. from the table field | |
| Setup Time | Setup Time | Specifies the setup time of the operation. from the table field | |
| Setup Time Unit of Meas. Code | Setup Time Unit of Meas. Code | Specifies the setup time unit of measure. from the table field | |
| Run Time | Run Time | Specifies the run time of the operation. from the table field | |
| Run Time Unit of Meas. Code | Run Time Unit of Meas. Code | Specifies the run time unit of measure. from the table field | |
| Wait Time | Wait Time | Specifies the wait time after processing. from the table field | |
| Wait Time Unit of Meas. Code | Wait Time Unit of Meas. Code | Specifies the wait time unit of measure. | |
| Move Time | Move Time | Specifies the move time. from the table field | |
| Move Time Unit of Meas. Code | Move Time Unit of Meas. Code | Specifies the move time unit of measure. | |
| Starting Time | Starting Time | Specifies the starting time of the routing line (operation). from the table field | |
| Starting Date | Starting Date | Specifies the starting date of the routing line (operation). from the table field | |
| Ending Time | Ending Time | Specifies the ending time of the routing line (operation). from the table field | |
| Ending Date | Ending Date | Specifies the ending date of the routing line (operation). from the table field | |
| Fixed Scrap Quantity | Fixed Scrap Quantity | Specifies the fixed scrap quantity. from the table field | |
| Lot Size | Lot Size | Specifies the lot size. from the table field | |
| Scrap Factor % | Scrap Factor % | Specifies the scrap factor in percent. from the table field | |
| Concurrent Capacities | Concurrent Capacities | Specifies the concurrent capacity of the operation. from the table field | |
| Send-Ahead Quantity | Send-Ahead Quantity | Specifies the send-ahead quantity of the operation. from the table field | |
| Routing Link Code | Routing Link Code | Specifies a routing link code. from the table field | |
| Unit Cost per | Unit Cost per | Specifies the unit cost for this operation if it is different than the unit cost on the work center or machine center card. |
Actions
| Group | Action | ToolTip | Runs |
|---|---|---|---|
| Work Ctr. | Capacity Ledger Entries | View the capacity ledger entries of the involved production order. Capacity is recorded either as time (run time, stop time, or setup time) or as quantity (scrap quantity or output quantity). | Page 5832 “Capacity Ledger Entries” |
| Comments | View or add comments for the record. | Page 99000784 “Manufacturing Comment Sheet” | |
| Load | View the availability of the machine or work center, including its the capacity, the allocated quantity, availability after orders, and the load in percent of its total capacity. | Page 99000887 “Work Center Load” | |
| Statistics | View statistical information, such as the value of posted entries, for the record. | Page 99000756 “Work Center Statistics” | |
| Functions | Move | Move the selected task to another work center. | |
| Order Tracking | Tracks the connection of a supply to its corresponding demand. This can help you find the original demand that created a specific production order or purchase order. |
Relations
- source table Table 5409 “Prod. Order Routing Line”
Documented on Microsoft Learn
Source: AL metadata extracted from the code (names, ids, signatures, properties); no code bodies (D10).
Ask your agent
Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Work Center Task List"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.