pageManufacturingofficial - Microsoftderived - from the source, no model text

Page 99001021 "Production Definition Wizard"

Base Application · Microsoft.Manufacturing.Wizard

Across versions

  1. BC23-29not present
  2. BC30added

Neighbourhood 4 connected objects and pages

Table 27 "Item" (relates to)ItemCodeunit 99001016 "Prod. Definition Temp Data" (calls, 13 links)Prod. Definition Temp DataCodeunit 99001015 "Prod. Definition Version Mgmt." (calls, 4 links)Prod. Definition Version Mgmt.Codeunit 8703 "Feature Telemetry" (calls)Feature Telemetry

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Base Application · Microsoft.Manufacturing.Wizard · BC30 · source at f18567dc · facts from BC30

Properties

Property Value
Caption Production Definition Wizard
SourceTable Item
PageType NavigatePage
UsageCategory None
ApplicationArea Manufacturing

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
StandardBanner MediaResourcesStandardBanner MediaResourcesStandard."Media Reference" —
General Item No. No. Specifies the item number for which production is being defined.
Description Description Specifies the description of the item.
BOM / Routing Details Source BOMRoutingFromSourceTxt Specifies the source from which BOM and Routing data was retrieved.
Save SaveBOMRouting Specifies whether to apply the selected BOM and Routing back to the source record.
Save in BOMRoutingSaveTarget Specifies where to apply the BOM and Routing changes (Item or Stockkeeping Unit).
Step Configuration BOM/Routing BOMRoutingDisplay Specifies the display and editing behavior for BOM and Routing selection steps. Hide: Skip steps. Show: View only. Edit: Full editing.
Prod. Components/Prod. Operations ProdComponentDisplay Specifies the display and editing behavior for Production Order Components and Routing preview steps. Hide: Skip steps. Show: View only. Edit: Full editing.
BOMCreationGroup BOMIntroductionText NewVersionIntroductionLbl —
Create New BOM Version CreateBOMVersion Specifies whether to create a new version of the Production BOM with an automatically generated version number.
Production BOM Selection Production BOM No. SelectedBOMNo Specifies the Production BOM to use.
Selected BOM Version SelectedBOMVersion Specifies the version of the Production BOM to use.
Production BOM Lines part Page 99001029 “Temp BOM Lines” —
RoutingCreationGroup RoutingIntroductionText NewVersionIntroductionLbl —
Create New Routing Version CreateRoutingVersion Specifies whether to create a new version of the Routing with an automatically generated version number.
Routing Selection Routing No. SelectedRoutingNo Specifies the Routing to use.
Selected Routing Version SelectedRoutingVersion Specifies the version of the Routing to use.
Routing Lines part Page 99001030 “Temp Routing Lines” —
Components Preview Components part Page 99001019 “Temp Prod. Order Comp. List” —
Production Order Routing Preview Prod. Order Routing Lines part Page 99001020 “Temp Prod. Ord. Rtng List” —

Actions

Group Action ToolTip Runs
Processing Back —
Next —
Finish —

Procedures

  • SetItem(Item: Record Item) (internal): Sets the item record that the wizard operates on.
  • SetBOMRoutingDisplay(DisplayType: Enum "Prod. Definition Display") (internal): Sets the display mode for the BOM and routing section of the wizard.
  • SetProdCompDisplay(DisplayType: Enum "Prod. Definition Display") (internal): Sets the display mode for the production order components section of the wizard.
  • SetTempData(var NewTempData: Codeunit "Prod. Definition Temp Data") (internal): Injects the temporary data codeunit that the wizard uses for BOM, routing, and production order data.
  • SetWizardMode(Mode: Enum "Prod. Definition Mode") (internal): Sets the operating mode of the wizard (e.g., define item structure or create production order).
  • GetBOMRtngSaveTarget(): Enum "Prod. Definition Save Target" (internal): Returns the user’s choice for where to apply the BOM and routing changes.
  • GetFinished(): Boolean (internal): Returns whether the wizard has been completed by the user.

Plus 23 local procedures.

Triggers

OnInit, OnOpenPage

Relations

Calls

From the extracted call graph of BC30 (graphify-al on the snapshot checkout): calls whose target is known from a declared type or an Object::"Name" argument. Interface dispatch and calls through events are not counted, so the list is not complete.

Recent changes

Ask your agent

Procedure bodies are not stored here (D10). The call sections above are our own, per object, from the BC30 call graph. For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "page", object_name: "Production Definition Wizard"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 1 sources