pageextensionManufacturingofficial - Microsoftderived - from the source, no model text

Page extension 20542 "Subc. Manufacturing Setup"

Subcontracting · Microsoft.Manufacturing.Subcontracting

Across versions

  1. BC23-28not present
  2. BC29-30present

Neighbourhood 1 connected objects and pages

Page 99000768 "Manufacturing Setup" (relates to)Manufacturing Setup

Open in the neighbourhood explorer

One hop out, from the extracted relations and call graph. Up to 40 shown; the sections below list them all.

Subcontracting · Microsoft.Manufacturing.Subcontracting · BC29-30 · source at ea08af5e · facts from BC29

Extends Manufacturing Setup.

Fields on this page

Layout controls in source order, grouped by the container they sit in. Shows: the table field a control is bound to (or its expression as written); ToolTip: the control’s own, else the bound field’s (marked).

Group Control Shows ToolTip
General Create Prod. Order Info Line Create Prod. Order Info Line Specifies whether an additional Information Line of the Production Order Line will be created in a Subcontracting Purchase Order.
Subc. Comp. Transfer Lead Time Subc. Comp. Transfer Lead Time Specifies the lead time for transferring components to the subcontractor. This time is subtracted from the production component due date to calculate the transfer order receipt date.
Subcontracting Template Name Subcontracting Template Name Specifies the name of the subcontracting journal template to be used for the direct creation of subcontracting orders from a released routing.
Subcontracting Batch Name Subcontracting Batch Name Specifies the name of the subcontracting journal batch to be used for the direct creation of subcontracting orders from a released routing.
Component Direct Unit Cost Component Direct Unit Cost Specifies which Direct Unit Cost of a Prod. Order Component is to be used in the subcontracting purchase order. Standard: Standard pricing is used when procuring the component. Prod. Order Component: The calculated Direct Unit Cost of the Prod. Order Component Line is transferred to the subcontracti…
Subc. Default Comp. Location Subc. Default Comp. Location Specifies where to get the default location for components supplied to the subcontractor.

Relations

Recent changes

Ask your agent

Procedure bodies are not stored here (D10). For a procedure body or the calls of one procedure, ask bc-code-atlas (external, by Stefan Maron, MIT; default corpus w1-28), which the bc-observatory plugin connects: bcatlas_resolve_node(object_type: "pageextension", object_name: "Subc. Manufacturing Setup"), then bcatlas_get_procedure_body or bcatlas_get_neighbors on the returned id.

Evidence 1 sources